Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Commission 1 - Reference Frames
http://iag.ensg.ign.fr
President: Zuheir Altamimi (France)
Vice President: Mike Craymer (USA)
Structure
Sub-Commission 1.1: Coordination of Space Techniques
Sub-Commission 1.2: Global Reference Frames
Sub-Commission 1.3: Regional Reference Frames
Sub-Commission 1.3 a: Europe
Sub-Commission 1.3 b: South and Central America
Sub-Commission 1.3 c: North America
Sub-Commission 1.3 d: Africa
Sub-Commission 1.3 e: Asia-Pacific
Sub-Commission 1.3 f: Antarctica
Sub-Commission 1.4: Interaction of Celestial and Terrestrial Reference Frames
IC Project 1.2:
Vertical Reference Frames
IC Working Gr. 1.1: Environment Loading: Modelling for Reference Frame and Positioning
IC Working Gr. 1.2: Precise Orbit Determination and Reference Frame Definition
IC Working Gr. 1.3: Concepts and Terminology Related to Geodetic Reference Systems
IC Working Gr. 1.4: Site Survey and Co-locations
Overview
Commission 1 activities and objectives are to deal with theoretical aspects of reference
systems and the practical applications for their realizations as well as applied researches. The
main objectives of Commission 1 are:
•
Definition, establishment, maintenance and improvement of the geodetic reference
frames.
•
Advanced terrestrial and space observation technique development for the above purposes.
•
International collaboration for the definition and deployment of networks of terrestrially-based space geodetic observatories.
•
Theory and coordination of astrometric observation for reference frame purposes.
•
Collaboration with space geodesy/reference frame related international services, agencies and organizations.
•
Promote the definition and establishment of vertical reference systems at global level,
considering the advances in the regional sub-commissions.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Introduction
The main activities of Commission 1 during the period 2007-2009 are the following:
•
A dedicated web site was established immediately after the IUGG General Assembly
in Perugia 2007, where the new Commission members were approved by the IAG
Executive Committee. The Web site (http://iag.ensg.ign.fr) contains all the information related to the activities and objectives of the commission, its sub-commissions,
projects and Working Groups. The Web site is regularly updated directly by the
president's sub-commissions and sub-component to reflect changes and continuous
activities of all commission entities.
•
A Steering Committee meeting was held in Vienna, April 16, 2008 were 7 participants
from the commission sub-components attended. The meeting was devoted to discussion on the main structure and activities of the commission. A few reports and presentations were provided, e.g. SC 1.3 (Regional Reference Frames), SIRGAS with a
complete informative presentation, and IC-P1.2. The main highlights of the meeting
were twofold: the IAG should give more emphasis to the activities of SC-1.3 and from
the research side, the participants indicated the need for some theoretical work on
Nutation under the lead of SC-1.4 in cooperation with Commission 3.
•
Participation in COSPAR GA held in Montreal, July 2008 and in Hotine Marussi symposium in Rome, July 2009.
•
It goes without saying that the main activities were undertaken by the commission
sub-components as presented in the rest of this mid-term report and highlighted hereafter.
Main highlights of the activities of Commission 1’ sub-components
Sub-commission 1.1: Coordination of Space Techniques.
The main activities of SC-1.1 are the development of GGOS-D project and the experimental
combination of the observation data from CHAMP and the GRACE satellites.
Sub-commission 1.2: Global Reference Frames
The main activities of SC-1.2 are: summary report on terminology related to reference
systems and frames, contribution to the updates of IERS Conventions and in particular,
Chapter 4 dealing with the terrestrial reference system and the establishment of working
group on an ITRS standardization for the benefit of GGOS.
Sub-commission 1.3: Regional Reference Frames
The main activities of SC-1.2 are: increase of the number of GNSS permanents stations within
the 6 regional sub-commissions; the establishment within SIRGAS of five associated analysis
centres under the responsibility of Latin American and Caribbean institutions; for NAREF,
realization of densifications of the ITRF and IGS global networks by weekly combinations of
six different regional weekly solutions using different GPS processing software packages; for
AFREF, creation of an Operational Data Centre (ODC) for AFREF with an open data policy,
expected to be operational within the second half of 2009; for Asia & Pacific, the realization
of an annual geodetic observation campaign in order to densify the ITRF in the Asia-Pacific
Region and to provide an opportunity to connect to national geodetic networks and to determine site velocities; and finally for Antarctica, the realization of SCAR GPS Campaigns in
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
2008 and 2009 where the data of 34 Antarctic sites are collected in the SCAR GPS database
beginning with the year 1995.
Additionally, one of the main new initiatives of SC-1.3 is the creation of an inter-regional
working group on Regional Dense Velocity Field. The WG appointed for each region a region
coordinator to gather velocity solutions for their region (in accordance with the WG requirements) to produce one regional combined velocity solution. A first set of preliminary regional
combined solutions is prepared for June 2009. The preliminary solution resulting from the
combination of the preliminary regional SINEX solutions with long-term solutions from
global networks will serve to identify problems and help to set strategic choices and guidelines. Some problems encountered up to now are being solved. A new solution is expected to
be issued in 2010-2011.
Sub-commission 1.4: Interaction of Celestial and Terrestrial Reference Frames
The main highlight of SC-1.4 activities includes the analysis of ICRS definition in view of the
latest development in astrometry and space geodesy as well as the analysis to generate the
next realization of the ICRS (ICRF2) at microwave frequencies using VLBI data.
IC Project 1.2: Vertical Reference Frames
The main IC-P1.2 is the realization of a global vertical reference system (GVRS) based on the
classical and modern observations and a consistent modeling of both, geometric and gravimetric parameters.
IC Working Gr. 1.1: Environment Loading: Modelling for Reference Frame and Positioning
The principal objective of the scientific work of Working Group 1.1 is to investigate optimal
methods to mitigate loading effects in ITRF frame parameters and site coordinates. The main
activities of the members of this working group are represented in papers published or in
preparation, as well as oral and poster presentations at the Fall Meetings of the American
Geophysical Union (San Francisco, CA, USA), General Assemblies of the European Geosciences Union (Vienna, Austria), and occasional other special and topical meetings. Based on
the WG research findings, the WG recommendation is that displacements due to non-tidal
geophysical loadings not be included in the a priori modeled station positions for reasons
detailed in the WG full report.
IC Working Gr. 1.2: Precise Orbit Determination and Reference Frame Definition
The members of the working group have agreed to focus on the effects of non-conservative
force model error in precision orbit determination and how it aliases into POD solutions. Progresses have also been made to mitigate the radiation pressure modelling on DORIS TRF
geocentre estimates.
IC Working Gr. 1.3: Concepts and Terminology Related to Geodetic Reference Systems
The WG has established a detailed report on recommended nomenclature related to Geodetic
Reference Systems.
IC Working Gr. 1.4: Site Survey and Co-locations
The WG held meetings in conjunction with EGU and AGU. A particular emphasis was placed
on attempting to establish a new challenging methodology for monitoring collocation vectors
in near real time.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Sub-Commission 1.1: Coordination of Space Techniques
President: Markus Rothacher (Switzerland)
Objectives
Sub-Commission 1.1 coordinates efforts that are common to more than one space geodetic
technique. It studies combination methods and approaches concerning the links between techniques co-located onboard satellites, common modeling and parameterization standards, and
performs analyses from the combination of a single parameter type up to a rigorous combination on the normal equation (or variance-covariance matrices) or even the observation level.
The list of parameters includes site coordinates (e.g. time series of positions), Earth orientation parameters, satellite orbits, atmospheric refraction (troposphere and ionosphere), gravity
field coefficients (primarily the low-degree harmonic coefficients), geocentre coordinates, etc.
The work of Sub-Commission 1.1 is done in close cooperation with the IAG Services, namely
the International Earth Rotation and Reference Systems Service (IERS), its Working Groups
on Combination and on Site Co-locations, the International GNSS Service (IGS), the International Laser Ranging Service (ILRS), the International VLBI Service for Geodesy and
Astrometry, the International DORIS Service (IDS), the IAG project “Global Geodetic
Observing System” (GGOS), and with COSPAR.
For more details see the Sub-Commission description at http://www.iag-aig.org.
General Remarks
Within Sub-Commission 1.1 three working groups have been established and continued their
work also in this second phase, i.e., after the IUGG General Assembly in Perugia 2007, in
order to make progress towards the goals described above:
SC1.1-WG1 on "Comparison and combination of precise orbits derived from different space
geodetic techniques"
SC1.1-WG2 on "Interactions and consistency between Terrestrial Reference Frame, Earth
rotation, and gravity field"
SC1.1-WG3 on "Comparison and combination of atmospheric information derived from different space geodetic techniques"
The three working groups are very important as steps towards GGOS, the Global Geodetic
Observing System of the IAG. They have the task to (1) compare and combine precise orbits,
to (2) study the interactions between the three pillars of geodesy, namely the Earth's geometry, Earth rotation and the Earth's gravity field as well as the temporal variations of these
three parts, and to (3) compare and combine the atmospheric information derived from different space geodetic techniques.
Considerable progress has been made in some of the field addressed by IAG Sub-Commission
1.1. Let us just name a few:
– As part of the GGOS-D project consistent long-term series of SINEX solutions have
been generated for GPS, VLBI and SLR including not only station coordinates and
Earth Rotation Parameters (ERPs) but also troposphere zenith delays and gradients,
quasar coordinates and low-degree coefficients of the Earth’s gravity field. Not all the
common parameters have yet been combined in one large multi-year solution, but
many studies have already been performed with these very valuable SINEX data sets.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
– Quite some experience has been gained with the combination of the observation data
from CHAMP and the GRACE satellites with the observations (GPS and SLR) of the
ground networks, an important step to combine geometry and gravity more extensively.
– JPL is studying a satellite project specifically dedicated to the co-location of the space
geodetic techniques onboard a new satellite. This will be complementary to the colocation efforts on the ground.
– A new IERS Working Group has been formed to make progress in the combination of
the space geodetic techniques on the observation level.
The activities of the three working groups of Sub-Commission 1.1 during the last few years
are summarized below.
Working Group SC 1.1 - WG 1: Comparison and Combination of Precise Orbits Derived
from Different Space Geodetic Techniques
Chair: Henno Boomkamp (Germany)
The main interest of the Working Group remains to improve techniques of comparing and
combining precise orbit solutions based on different space geodetic techniques, in support of
the more generic objectives of IAG Commission 1 and GGOS. As a result of propositions and
discussions held during the reporting period, a new approach is proposed in this field and will
be the main subject of this report.
The DANCER project
The DANCER system forms an internet-based solution approach to construct least squares
estimation processes for an unlimited station network size. In this method, the normal matrix
contributions from individual geodetic instruments are accumulated on a local PC at the
ground station. All station-dependent parameters (station coordinates, clocks, troposphere
delays, etc.) are pre-eliminated from the normal equation system by the local estimation
process (see Figure 1 and Eq. 1). The remaining global normal matrix partition is exchanged
among all participating computers via internet, using a highly efficient scheme called square
dancing. This algorithm provided the name DANCER, which also reflects a close relation to
the DIGGER project that will be revisited further below. After the square-dance matrix accumulation process, all PCs in the network hold the same global matrix partition. This allows
r
every individual computer to solve the global parameter corrections x A for Earth rotation
r
parameters and satellite parameters. The global solution vector x A is substituted in the prer
elimination equations (1) to find the local parameter corrections xC of the station. The entire
least squares solution is iterated to convergence.
The outcome of this distributed estimation process is mathematically identical to a single least
squares solution for all involved observations and parameters, but can include many
thousands of stations. While no individual analysis centre would be able to handle such a
large estimation process, the DANCER processing effort at individual tracking stations is
rather modest. The involved internet traffic is in the order of 50 megabytes per station per
solution, which is a trivial load for modern internet connections. The DANCER solution
process can span an arc of e.g. the most recent 48 hours and is repeated at regular intervals,
e.g. every two hours, in analogy to current IGS products.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
=
+
+
+ ...
Figure 1: Normal matrix of a least squares process, written as the sum of contributions from individual geodetic
instruments. The global (red) partition requires summation of many contributions, but other partitions (yellow,
purple) are only relevant to a single receiver. These station-dependent partitions are pre-eliminated and only the
global partitions are exchanged.
r
r
r
r
r
⎧ Ax A + BxC = b A
⎛ A B ⎞⎛ x A ⎞ ⎛ b A ⎞
r
⎟⎟⎜⎜ r ⎟⎟ = ⎜⎜ r ⎟⎟ ⇒ ⎨ t r
⎜⎜ t
r
B
C
(1)
⎠⎝ xC ⎠ ⎝ bC ⎠
⎝
⎩ B x A + CxC = bC
r
r
r
r
r
r
xC = C −1 bC − B t x A ⇒ A − BC −1 B t x A = b A − BC −1bC
r
Eq. 1: Pre-elimination of a station-dependent vector xC provides an equation for the global parameter correcr
tions x A only. Matrix A corresponds to the red partition of Figure 1, matrix B is the purple correlation block,
(
)
(
)
and matrix C is a yellow station-dependent partition.
Square dance method
It is clear that the DANCER solution depends on the efficiency with which the global normal
matrix information can be exchanged via internet. This turns out to be remarkably simple with
an accumulation method called square dancing. In this approach, pairs are formed among all
computers in the network. The two computers in each pair exchange their matrix contributions and add the incoming matrix to their own matrix (step 1 of Figure 2). New pairs are now
formed between pairs of the first cycle (step 2 of Figure 2). Each computer exchanges its
matrix with a computer of the other pair, and adds the incoming matrix to its own matrix. The
four computers in the pair of pairs now hold the same sum of the four original matrix contributions.
In a third cycle, new pairs are formed between clusters of four computers from the previous
cycle (step 3 in Figure 2), etc. It will be clear how this pair-wise exchange can be repeated as
many times as necessary. Each consecutive cycle doubles the size of clusters with identical
matrix sums. For a network of size N, only 2logN complete cycles are required to accumulate
the global sum of all initial matrix contributions at all participating computers. In practice, the
network size will not be an exact power of two, but this problem is easily solved. For
instance, in a network of N = 10,000 computers, we find that 213 < N < 214. The largest power
of two for which a complete exchange process is possible is 213 = 8192. To form a sub-network of exactly this size, 1908 computers simply upload their matrix to another computer in
the network at the start of the process. The receiving computers add the incoming matrix to
their own matrix, after which only 8192 independent matrix contributions remain that are
added together in 13 square dance cycles. After completion, the 1908 computers that were left
out of the process download the global sum, which already includes their own contribution.
Because of the exponential rate with which the normal matrix information disperses through
the network, the square dance approach is insensitive to an increase in network size. As
shown above, an individual computer in a network of 10,000 computers will perform at most
14 exchange cycles to obtain the global sum of all matrix contributions. For a network of
80,000 computers, only three additional cycles would be required (23 = 8). This adds just a
few minutes to the communication process, which is irrelevant in comparison to the overall
process duration and its repeat rate (~hours). Individual computers only need to contact about
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
15 different computers in the network, which means that the involved socket connections can
be kept open throughout the solution process for reducing wait states. The overall complexity
and data volume involved with the square dance matrix accumulation process is comparable
to that of reading a newspaper on the internet.
1
…
…
2
3
Figure 2: Square dance accumulation logic among a network of computers.
The above sections explain the basic concepts behind the DANCER solution, without going
into all details. In practice, there are various complications that took some time to be solved.
For instance, multiple layers of pre-eliminations and square dance exchanges are needed to
cope with epoch-dependent parameters (GNSS clocks) and satellite-dependent parameters. A
slightly different exchange mechanism is needed in support of GNSS ambiguity resolution.
The DANCER system also involves a few centralized internet sites (hubs) where stations can
check-in if they want to be part of the next global solution. The process needs various safety
mechanisms, to cope with computers that go off-line in the middle of a solution process - etc.
The concept is in fact conveniently redundant, because clusters of computers with the same
intermediate matrix can immediately provide backup in case of unexpected loss of an individual computer, and spare computers can usually be found in a pool of unused participants
(in the example above, there are 1908 spare computers). Such details fall outside the scope of
this report, and do not change the principle of a distributed estimation process.
Consequences to IAG / GGOS
In terms of efficiency and possible solution size, distributed processing is expected to be
orders of magnitude more powerful than the traditional centralized processing approach at
Analysis Centres. The DANCER system does not really have any network size limit, because
it is perfectly scalable: every new receiver brings its own computer, so that the workload for
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
individual computers is only affected by a possible increase in exchange cycles – however,
this will only add a few percent to the process duration. It could therefore be concluded that
the centralized product generation of the current IAG services could benefit from such solutions and that in the long term such distributed estimation software could even be fully integrated with the software of high-end GNSS receivers and similar geodetic instruments: global
estimation products like Earth rotation parameters will then become output products of the
receivers.
The implications of a distributed processing approach for the current IAG and its services can
be profound. Some effects will be:
•
All permanent geodetic GNSS receivers in the world can be included in a single, coherent ITRF solution. The differences between regional networks and global networks
disappear: all receivers become part of the same global GNSS network. This can lead
to ITRF solutions based on ten thousands of receivers, as opposed to currently only
400. This solves most of the network densification issues.
•
Most elements of the centralized IAG Services (data centres, analysis centres, product
centres) could significantly benefit. The DANCER software transforms an individual
geodetic instrument into a mini data centre, a mini analysis centre, and a mini product
centre. Data and products may still be published by the station operator on a voluntary
basis, but stations can also participate anonymously in the DANCER solution, sharing
neither their data nor their products. It seems obvious that stations that want to be in a
formal ITRF solution must always publish their data and their position coordinates, in
order to allow independent validation.
•
Combination solutions seem no longer required if all observations can be processed in
a single, mathematically clean least squares solution. The DANCER solution may
provide perfectly coherent estimation products for all involved receivers and tracking
stations, and consistency between local and global estimation products.
•
With DANCER, all GNSS processing is expected to be possible at a higher data rate
than what is typically done by the IGS Analysis Centres today. This improves the
signal-to-noise ratio and therefore the solution quality. A data rate of 30 seconds is
foreseen, which also allows inclusion of data from orbiting receivers. To this purpose,
the LEO download stations can run the DANCER software and the LEO orbit parameters become pre-eliminated “station” parameters. This conveniently avoids LEO
data distribution issues (data publication latency) that in the past have lead to many
discussions: the data does not have to be published at short latency, but can nonetheless contribute to the estimation of the pole in near real-time.
•
High-end GNSS users anywhere in the world can run the DANCER software on their
own PC, and join the next available global solution via internet. The user data is
treated in exactly the same way as the observations from the reference sites (with the
exception that no-net-rotation conditions etc. should only be derived from properly
monumented geodetic sites). This means that users obtain precise ITRF coordinates
and UTC time offsets for their own receiver from a global solution process, at accuracy levels that are currently only available to IGS stations. In other words: DANCER
offers direct access to the ITRF and to UTC anywhere on the planet, maybe even replacing current techniques such as short-baseline differential GPS.
•
Other geodetic instruments, in particular SLR stations, DORIS download stations and
VLBI correlation centres can also join the global solution with their own data. These
stations will then observe the same polar motion parameters that are estimated by the
GNSS network, while their estimated station coordinates are subject to the same
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Helmert constraints as the GNSS receivers. This global solution then provides perfect
consistency among all space geodetic techniques, which forms the main objective of
IAG Sub-Commission 1.1.
•
All formal objectives of WG 1 may be accomplished simultaneously if the geodetic
reference sites start using the DANCER software once available. The DANCER
system would implement a true Global Geodetic Observation System by making all
geodetic instruments work together via internet. This turns the network of instruments
into a single sensor for polar motion, satellite orbits and other global parameters.
Implementation status of DANCER and DIGGER
The DIGGER project has been introduced via a previous report of the WG 1.1.1. (2007), and
in a report to the IGS Governing Board (December 2007). It aims at fast reprocessing of space
geodetic data by means of distributed processing (grid computing) on internet. DIGGER uses
an iterative conjugate gradient solution to split a huge least squares process (spanning ~15
years of data) into thousands of manageable tasks. It uses a data exchange scheme similar to,
but slightly different from, the DANCER square dance method to exchange the involved solution vectors.
The data traffic involved with DANCER is highly insensitive to network size, but very sensitive to the size of the global matrix partitions. It would for instance be prohibitive to estimate
a gravity field model with DANCER, while it is not a problem to include many thousands of
stations in one solution. This means that DANCER is mainly suitable for computing large
network solutions in near real-time, generating most of the typical products that are currently
generated by IGS and other services, such as station coordinates, troposphere parameters,
satellite orbits and polar motion parameters. DIGGER does not have a practical limitation on
the number of global model parameters, as long as a sufficiently large number of computers
participate in the process. This makes DIGGER suitable for estimating large geophysical
models from long data periods (gravity field, tides, station velocities). The two projects are
therefore complementary.
The implementation of the internet-based applications DIGGER and DANCER may be
realised in C++ or JAVA, preferably in close collaboration between IAG Analysis Centres
and industry.
The main element of both, DIGGER and DANCER, is compact, efficient and highly portable
parameter estimation software. In fact, DIGGER really requires a single-binary / single
control-file layout in order to be supported by the Berkeley Open Infrastructure for Network
Computing (BOINC), which has been selected as the driver of the grid computing process for
various strong reasons. For DANCER it is merely convenient if the software is as compact as
a single binary, but this would not be strictly required. For both projects it is essential that the
orbit estimation software is under strict configuration control, and that automatic updating via
internet is supported. There are obvious advantages in using the same core parameter estimation software for DIGGER and DANCER:
•
One development trajectory requires less effort than two separate trajectories
•
The same modelling standards will automatically be used in re-processing and operational product generation
•
Changes in (e.g.) IERS conventions or other processing standards only need to be
implemented once and will always be consistent between the two systems
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
•
The same computers that will be using DANCER might as well be used in the
DIGGER project. If each station archives its own data, it can later reprocess that data
for a DIGGER process, whenever requested. This means that a complete merge of the
two systems may be an option in the long-term.
A suitable single binary orbit estimation system (ROBOD) is currently being implemented on
behalf of ESOC, using state-of-art software engineering methods and several independent
design optimizations. By the time of the previous IAG report (2007), this project was just
moving from its prototype stage at ESOC towards formal implementation by industry. At the
time of the current report, a first version was delivered, currently undergoing a critical design
review. As soon as all relevant state-of-art precision levels are accomplished, such software
could form the core of the DIGGER project. In fact, the prototype software had already been
installed successfully under the BOINC grid computing software, showing the feasibility of
the concept. However, a more comprehensive demonstration under realistic conditions combined with a thorough verification and validation campaign would be required in order to
assess the full potential of the proposed solution.
Conclusion
Because the DANCER and DIGGER projects can accomplish most if not all objectives of
WG 1 of Sub-Commission 1.1, and most objectives of other IAG sub-commissions and
GGOS, it seems recommendable to pursue these two strategic targets further.
Working Group SC 1.1 - WG 2: Interactions and consistency between Terrestrial
Reference Frame, Earth rotation, and gravity field
Chair: Detlef Angermann (Germany)
Objectives
Working Group 2 of Sub-Commission 1.1 “Coordination of Space Techniques” is a joint WG
with Commission 2, Commission 3, and the Global Geodetic Observing System (GGOS).
The main research topics are:
• Study the theoretical and practical interactions/relationships between parameters and
models describing the terrestrial reference frame (TRF), Earth rotation and the gravity
field (e.g., low-degree spherical harmonic coefficients).
•
Assess and study the consistency of the products of these three fields.
•
Develop improved methods to integrate and combine these three fields by using different space geodetic techniques (VLBI, SLR, GNSS, DORIS) and by including Low
Earth Orbiting (LEO) satellites.
Working Group activities
During the period of this report various activities related to the integration of geometry, Earth
rotation and gravity, and the interactions between these three fields were carried out. A major
focus was on the assessment and study of systematic biases between different space techniques, improvements regarding the unification of standards for the modeling and parameterization of the different observations, as well as the development of improved methods for a
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
consistent estimation of products of the three fields geometry, Earth rotation and gravity. Two
projects, that address various topics of this WG, are explicitly mentioned below:
•
Within the GGOS-D project (funded by BMBF, 2005 – 2008), homogeneously processed observation time series have been generated for the different space geodetic
observation techniques, as the basis for the computation of a GGOS-D terrestrial reference frame and for the generation of consistent, high-quality time series of site coordinates, Earth rotation parameters, quasar coordinates and low-degree harmonics of the
Earth’s gravity field. The project involves four institutions: GeoForschungsZentrum
Potsdam (GFZ), Bundesamt für Kartographie und Geodäsie (BKG), Institut für Geodäsie und Geoinformation, Universität Bonn (IGG), and Deutsches Geodätisches Forschungsinstitut (DGFI), see Rothacher et al. (2007).
In the framework of the project “Integration of Earth rotation, gravity field and geometry
using space geodetic observations” within the DFG Research Unit „Earth Rotation and Global
Dynamic Processes“ improvements have been achieved regarding the combination of geometric and gravimetric observations. A major focus was on the analysis of geophysical contributions to Earth rotation changes determined from geometric, gravimetric and altimetric
space observations as well as from geophysical models (see for example Göttl and Seitz,
2009). The project started in 2006 and is now in the second funding period (2009-2012).
Fig. 1: Mean annual behavior of homogeneously processed VLBI (blue stars) and GPS (red circles) height time
series at four co-location sites. The figures illustrate 90 days moving weighted means and their formal errors,
computed each 7 days from the daily height estimates.
As an example for the working group activities we provide some results of the GGOS-D
project. The time series analysis of station positions has shown non-linear variations of station
positions, especially in the height component. Fig.1 shows the mean average of such annual
variations for four GPS-VLBI co-location sites. The results were obtained from consistently
processed VLBI and GPS observation time series, which have been generated in a joint effort
by DGFI, GFZ Potsdam and Technische Universität München. The observed seasonal signals
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
may be caused by atmospherical, hydrological and non-tidal oceanic loading effects, which
are not reduced from the original observations.
A deficiency regarding the current strategy for the computation of long-term solutions is, that
the temporal variations of station positions are described only by constant velocities. Deviations of the station motions from a linear model (e.g., seasonal variations) will produce errors
in the products for the three fields (geometry, Earth rotation and gravity). A suitable handling
of these seasonal variations in station positions is a challenge for the future.
References
ANGERMANN, D., H. DREWES, M. GERSTL, B. MEISEL, M. SEITZ, D. THALLER: GGOS-D Global Terrestrial
Reference Frame, Springer, 2009, in press.
GÖTTL, F., F. SEITZ: Contribution of non-tidal ocean mass variations to polar motion determined from space
geodesy and ocean data. IAG Symp., Vol. 133, Springer, 2009.
ROTHACHER, M., DREWES, H., NOTHNAGEL, A., RICHTER, B.: Integration of space geodetic techniques as the
basis for a Global Geodetic-geophysical Observing System (GGOS-D): An overview. GEOTECHNOLOGIEN Science Report, No. 11, ISSN 1619-7399, 2007.
STEIGENBERGER, P., ROTHACHER, M., DIETRICH, R., FRITSCHE, M., RÜLKE, A., VEY, S.: Reprocessing of a global
GPS Network. Journal of Geophysical Research, Vol. 111, B05402, 2006.
TESMER, V., P. STEIGENBERGER, M. ROTHACHER, J. BOEHM, B. MEISEL: Annual deformation signals from
homogeneously reprocessed VLBI and GPS height time series, Journal of Geodesy, DOI:10.1007/s00190009-0316-3, 2009.
Working Group SC 1.1 - WG 3: Comparison and combination
of atmospheric information derived from different space geodetic techniques
Chair: Johannes Böhm (Austria)
The main task of Working Group 3 is the comparison and combination of atmospheric information derived from different space geodetic techniques, such as GPS, VLBI, DORIS, or altimetry. Major research topics are the investigation of differences between the troposphere
delay parameters and the Total Electron Content (TEC) values with the assessment of
systematic biases between the techniques in particular. The Global Geodetic Observing
System (GGOS) with the goal to integrate all observations of geometry, rotation and gravity
field of the Earth, is requiring the accurate, consistent, and bias-free modelling of delays in
the neutral atmosphere ('troposphere') as well as in the ionosphere over all techniques.
As already summarized in the last Working Group 3 Report (Rothacher et al., 2007), many
investigations have been carried out to compare the troposphere parameters derived from
GPS, VLBI, and DORIS with observations from water vapour radiometers (WVR) and values
from numerical weather models, e.g. Snajdrova et al. (2005), Ichikawa et al. (2006), and
Krügel et al. (2007) for the 15-days continuous VLBI campaigns CONT02 and CONT05, or
Steigenberger et al. (2007) and Heinkelmann et al. (2007) for long time series from VLBI and
GPS. In recent years, a common research project by several German institutions has dealt
with the Integration of Space Geodetic Techniques as the Basis for a Global Geodetic-Geophysical Observing System (GGOS-D, Rothacher et al., 2009). More information about this
project is available at the webpage http://www.ggos-d.de.
Some PhD. theses (partly in German) were finished in the last years which also deal with the
comparison and combination of atmosphere delay parameters derived from space geodetic
techniques, e.g. Thaller (2008), Heinkelmann (2008), and Schmid (2009) for the troposphere
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
or Todorova (2009) for the ionosphere. Those theses contain detailed and very important
information for this working group, and some results are extracted from them.
Troposphere delay comparisons
The best agreement of zenith delays between two techniques is found for GPS and VLBI with
a standard deviation of about 5 mm, and it is shown by Schmid et al. (2005) and Schmid
(2009) that the biases between the techniques decrease when using absolute phase centre
patterns for GPS. However, there remains a significant influence on the zenith delays at those
GPS antennas covered by a random.
Figure 1 (from Thaller, 2008). WRMS of the zenith delay differences depending on the size of the estimated wet
zenith delays. IVS refers to the combined solution of the International VLBI Service for Geodesy and Astrometry, VLBI is a dedicated VLBI solution using exactly the same geophysical models as the dedicated GPS
solution.
Figure 2 (from Nothnagel et al., 2009). Mean gradients in north-south direction of co-located VLBI and GPS
stations.
Important for the comparison and in particular for the combination is the use of identical geophysical models for the determination of the a priori troposphere delays. The a priori hydrostatic zenith delays are usually determined from pressure values at the site, which can be
measured locally, extracted from a numerical weather model or - with minor precision determined from empirical equations like the recently developed GPT model (Boehm et al.,
2007). The same holds for the selection of the hydrostatic mapping function: mapping
functions based on data from numerical weather models like the VMF1 (Boehm et al., 2006a)
are more accurate, but new empirical mapping functions like GMF (Boehm et al., 2006b) are
easier to be implemented and yield also consistent values across the techniques. However,
geodetic analysis should certainly go for the most accurate models as e.g. shown by Steigen-
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
berger et al. (2009), requiring that special care is taken to derive consistent values for the
different techniques.
Combination of troposphere delays
It is essential to apply very accurate measures for the local ties between the various antennas
at a site, because the differences in the station coordinates also correspond to differences in
the hydrostatic and wet zenith delays. This is important for the combination of space geodetic
observations: Any technique observing at microwave frequencies at a site is sensitive to the
same troposphere delays; thus, if the local ties and the troposphere ties (!) are accounted for
properly, the geodetic results (e.g. station coordinates but also troposphere parameters) benefit
from the combination because more observations are contributing to the estimation of the
same parameters. So far, routine combinations at the normal equation level do not include
troposphere parameters, but future combinations should definitely take them into account.
For the combination of troposphere parameters from different space geodetic techniques, the
normal equations have to be set up properly: the time intervals for the troposphere parameters
should start at integer hours (e.g. 18:00 UTC) and at integer fractions of it (e.g. 18:15, or
18:30, ...), offset and rate should be set up for each interval, and the time intervals should be
rather short because they can be concatenated at a later stage if necessary (Thaller, 2008). It is
recommended to use piecewise linear offsets for the representation of troposphere parameters
because these can easily be combined at a later stage.
Thaller (2008) concludes in her PhD. thesis that the inclusion of the troposphere parameters
into the combination yields time series of zenith delay and horizontal gradients for the GPS
and VLBI sites that are fully consistent with the common reference frame. The consistency is
especially important as the time series based on the independent single-technique solutions'
reference frames differ from those time series based on a common reference frame by up to 2
mm at mean. Thaller (2008) states that a combination of the zenith delays can stabilize the
determination of the height coordinate, although this stabilization has not been seen for all colocations. But she has demonstrated that a stabilization of the height component by combining
the zenith delay is achieved if the local tie for the corresponding co-location is missing. The
combination of the zenith delay acts only indirectly on the stability of the station height, thus,
the combination of the zenith delay cannot fully replace the information that is given by introducing the local tie directly. However, as the problems concerning local tie values are manifold, the combination of the troposphere parameters might be an alternative to the application
of local tie values that are questionable.
Thaller (2008) also summarizes that a stabilization of the solution similar to the effect seen for
the combination of the troposphere zenith delay could not be shown for the combination of
the troposphere gradients, neither with horizontal local ties additionally introduced nor without applying the local ties. However, it could be demonstrated that the common treatment of
troposphere gradients together with the TRF can give valuable information about the discrepancy between the local tie and the coordinate differences derived from the space-geodetic
techniques.
Comparison and combination of ionosphere delays
The ionosphere (from approximately 50 km to 1000 km) is dispersive for microwaves, and
therefore the ionospheric delays (or phase advances, respectively) can be mostly eliminated
by observing at two frequencies. However, the ionospheric delays, which are different for all
techniques, are caused by similar Total Electron Content (TEC) values. Thus, all dual-
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
frequency techniques should determine similar TEC values at the same line of sight or
Vertical (VTEC) values above a point on the Earth surface.
Within the IGS Ionosphere Working Group comparisons of TEC values were carried out
between those values determined from IGS TEC maps and TEC values from altimeter observations (e.g. JASON, TOPEX, ENVISAT) (Hernández-Pajares et. al, 2009). These comparisons, which are only possible over the oceans and thus provide a lower boundary for the GPS
TEC performance, yielded a mean bias of about zero and a mean standard deviation over all
latitudes of about 5 TECU, but comparisons near the coast (with close GPS stations) implied
that standard deviations can be as low as 2 TECU. A first comparison between STEC values
predicted by the IGS combination and the observed ones by DORIS (on board JASON)
resulted in a standard deviation better than 1 TECU over all latitudes (Hernándes-Pajares,
2005). Hobiger et al. (2006) provided comparisons of TEC values between GPS and VLBI
over the VLBI radio telescopes. They found a mean bias (VLBI minus GPS) above all sites of
−2.8 TECU and an RMS of ±10 TECU.
Figure 3 (from Todorova, 2009). Daily mean VTEC of the difference Jason-1 minus IGG VTEC in July 2006.
References
Boehm, J., R. Heinkelmann, H. Schuh, Short Note: A Global Model of Pressure and Temperature for Geodetic
Applications, Journal of Geodesy, doi:10.1007/s00190-007-0135-3, 2007.
Boehm, J., B. Werl, H. Schuh, Troposphere mapping functions for GPS and very long baseline interferometry
from European Centre for Medium-Range Weather Forecasts operational analysis data, J. Geophys. Res., 111,
B02406, doi:10.1029/2005JB003629, 2006a.
Boehm, J., A. Niell, P. Tregoning, H. Schuh, Global Mapping Function (GMF): A new empirical mapping
function based on data from numerical weather model data, Geophysical Research Letters, Vol. 33, L07304,
doi:10.1029/2005GL025546, 2006b.
Heinkelmann, R., J. Boehm, H. Schuh, S. Bolotin, G. Engelhardt, D. S. MacMillan, M. Negusini, E. Skurikhina,
V. Tesmer, O. Titov, Combination of long time-series of troposphere zenith delays observed by VLBI,
doi:10.1007/s00190-007-0147-z, 2007.
Heinkelmann, R., Bestimmung des atmosphärischen Wasserdampfes mittels VLBI als Beitrag zur Klimaforschung, Geowissenschaftliche Mitteilungen, Heft Nr. 82, Schriftenreihe der Studienrichtung Vermessung und
Geoinformation, Technische Universität Wien, ISSN 1811-8380, 2008.
Hernándes-Pajares, M., J.M. Juan, J. Sanz, R. Orus, A. Garcia-Rigo, J. Feltens, A. Komjathy, S.C. Schaer, A.
Krankowski, The IGS VTEC maps: a reliable source of ionospheric information since 1998, Journal of Geodesy,
83:263-275, 2009.
Hernándes-Pajares, M., on behalf of the IGS Ionosphere WG, Summary of IGS Ionosphere WG Activities (April
2004 - 2005), summary report presented at the Governing Board meeting in Vienna, Austria, 2005.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Hobiger, T., T. Kondo, H. Schuh, Very long baseline interferometry as a tool to probe the atmosphere, Radio
Science, Vol. 41, RS1006, 2006.
Ichikawa, R., H. Kuboki, M. Tsutsumi, Y. Koyama, J. Fujisaku, K. Kokado, M. Ishimoto, K. Takashima, Zenith
wet delay comparisons at Tsukuba and Kashima VLBI stations during CONT05 VLBI campaign, Technology
Development Center News, No. 27, NICT, 2006.
Krügel, M., D. Thaller, V. Tesmer, M. Rothacher, D. Angermann, R. Schmid, Tropospheric parameters: combination studies based on homogenous VLBI and GPS data, Journal of Geodesy, doi:10.1007/s00190-006-01278, 2007.
Nothnagel, A., T. Artz, S. Böckmann, N. Panafidina, M. Rothacher, M. Seitz, P. Steigenberger, V. Tesmer, D.
Thaller, GGOS-D Consistent and Combined Time Series of Geodetic/Geophysical Parameters, Springer, 2009,
in press.
Rothacher, M., H. Boomkamp, D. Angermann, J. Boehm, Sub-commission 1.1 Coordination of Space Techniques, Report for the Period 2003-2007, IAG-Commission 1 - Reference Frames, Bulletin No. 20, Report 20032007, edited by H. Drewes and H. Hornik, Munich, 2007.
Rothacher, M., H. Drewes, A. Nothnagel, B. Richter, Integration of Space Geodetic Techniques as the Basis for
a Global Geodetic-Geophysical Observing System (GGOS-D), Springer Verlag, 2009, in press.
Schmid, R., M. Rothacher, D. Thaller, P. Steigenberger, Absolute phase centre corrections of satellite and
receiver antennas, GPS Solutions, 9, pp 283-293, 2005.
Schmid, R., Zur Kombination von VLBI und GNSS, Dissertation an der TU München, http://mediatum2.
ub.tum.de/download/654198/654198.pdf, 2009.
Snajdrova, K., J. Boehm, P. Willis, R. Haas, H. Schuh, Multi-technique comparison of tropospheric zenith
delays derived during the CONT02 campaign, Journal of Geodesy, doi:10.1007/s00190-005-0010-z, 2005.
Steigenberger, P., V. Tesmer, M. Krügel, D. Thaller, R. Schmid, S. Vey, M. Rothacher, Comparison of homogeneously reprocessed GPS and VLBI long time-series of troposphere zenith delays and gradients, Journal of
Geodesy, doi:10.1007/s00190-006-0124-y, 2007.
Thaller, D., Inter-technique combination based on homogeneous normal equation systems including station
coordinates, Earth orientation and troposphere parameters; Dissertation, Scientific Technical Report STR 08/15,
Deutsches GeoForschungsZentrum, ISSN 1610-0956, doi:10.2312/GFZ.b103-08153, 2008.
Todorova, S., Combination of space geodetic techniques for global mapping of the ionosphere, Geowissenschaftliche Mitteilungen, Heft Nr. 84, Schriftenreihe der Studienrichtung Vermessung und Geoinformation,
Technische Universität Wien, ISSN 1811-8380, 2009.
Outlook
Considerable progress has been made in some of the combination issues that are addressed by
IAG Sub-Commission 1.1. However, in order to reach a rigorous combination of all common
parameters present in the solutions of the individual space geodetic technique much has still
to be achieved. The next steps should be:
• The terrestrial reference frame, the Earth Orientation Parameters (EOPs) and the
celestial reference frame should be linked in a consistent way. Therefore, the quasar
coordinate estimates (derived from VLBI data) should be included in the normal
equations systems or variance-covariance matrices to be combined.
• Daily solutions should be generated from GPS, DORIS and VLBI that contain not
only station coordinates and Earth Rotation Parameters (ERPs) but also troposphere
zenith delays and gradients. The combination of troposphere zenith delays and
gradients is important to improve the consistency of the solutions and to detect technique-specific biases.
• Low-degree coefficients of the Earth’s gravity field and range biases should be
included in the SLR weekly solutions and should become part of the combined intratechnique solutions produced by the ILRS combination centers.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
• Low Earth Orbiters with more than one observation technique onboard should be
analyzed to benefit from the co-location of instruments in space. The inclusion of
LEOs like CHAMP, GRACE, and GOCE into the global solutions based on the
ground networks (GPS and SLR) would also help to link geometry and the gravity
field.
The GGOS-D project has started some work at these frontiers, but we see from the few items
above, that large deficits still exist and a lot of work is still ahead of IAG Sub-Commission
1.1. The long-term goal of Sub-Commission 1.1 is still the development of a much better
understanding of the interactions between the parameters describing geometry, Earth rotation,
and the gravity field, as well as the study of methods to validate the combination results, e.g.,
by comparing them with independent geophysical information.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Sub-Commission 1.2: Global Reference Frames
President: Claude Boucher (France)
The IAG Sub-Commission 1.2 was created 1n 2003 as a part of the new structure of the International Association of Geodesy (IAG).
Terms of Reference and Objectives for 2007-2010
Sub-Commission 1.2 is engaged in scientific research and practical aspects of the global reference frames. It investigates the requirements for the definition and realization of the terrestrial
reference systems (TRS) and frames (TRF), addresses fundamental issues closely related to
TRS, such as multi-technique global geodetic observatories (local ties, site effects, interdisciplinary use…) or methods for the combined processing of heterogeneous observation
data. The work will be done in close cooperation with the International Earth Rotation and
Reference Systems Service (IERS), in particular with the ITRS Product Centre, the other
relevant IAG services (IGS, ILRS, IVS, IDS), and the IAG Global Geodetic Observing
System (GGOS). Theoretical aspects (e.g., quality measures, relativistic modeling) will be
investigated in cooperation with the Inter-Commission Committee on Theory.
The following research topics will form the fundamental objectives during the next period:
•
Basic concepts and related terminology
•
Improvement of relativistic modeling
•
Fundamentals of the realization of the global terrestrial reference frames: co-location
problems, local ties, datum problems (origin, scale and orientation, time evolution),
coordinates origin, geo-centre, time series approach, long-term consistency with EOPs
and ICRF…
•
Analysis of strengths, weaknesses and systematic differences (biases) of individual
techniques (VLBI, SLR, GPS, DORIS) related to their contribution to global combined TRF
•
Combination methodologies of individual techniques' solutions and analysis of the
underlying models, parameters, datum definitions etc.
•
TRF by multi-technique data analysis
•
Global Geodetic Observatories, concepts and practical implementation
Structure
President: Claude Boucher (France)
The sub-commission has an open membership. Current list is given in the list of members
given below. Details about its activities will be given in its web page accessible through the
IAG links.
Study Groups and Working Groups linked to SC1.2 :
IC-SG1: Theory, implementation and quality assessment of geodetic reference frames
(jointly with ICCT) Chairman: Sakis Dermanis (Greece)
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
IC-WG3: Concepts and terminology related to Geodetic Reference Systems Chairman:
Claude Boucher (France)
IC-WG4: Site Survey and Co-location (jointly with IERS) Chairman: Perguido Sarti (Italy)
Link to IAG Commission 1: http://iag.ensg.ign.fr/
Activities for the period 2007-2009
This report provides only summaries of activities related to the Sub-commission. For more
details or references, visit the web pages hosted by the IAG Commission 1 website.
Terminology
The IC-WG2 was specifically devoted to this subject. The group published a summary report
detailed as a separate report in this document. In addition, a scientific paper is under preparation.
The new release of the IERS Conventions actually implement this terminology, through the
active contribution of several members of the SC, either in drafting or within the IERS Convention Advisory Board chaired by Jim Ray.
Site survey and co-locations
This IERS Working Group is considering to reactivate its involvement in research topics, and
therefore its re-link with the SC activities, thanks to Perguido Sarti who is now chairing this
group.
International Terrestrial Reference System (ITRS)
At the IUGG/IAG General Assembly of Perugia, an IUGG resolution was approved about
ITRS, related to its definition and adoption by the geosciences community. The definition is
consistent with the recent IAU resolutions. More details can be found in the new version of
the IERS Conventions.
It is worthwhile to mention numerous efforts to promote the adoption of ITRS and its realizations as unique preferred system among the various communities. Several actions have started
in the frame of GGOS, specifically:
•
Establishment of a working group on an ITRS standard
•
Leading a sub-task in the frame of GEO on these issues
Within the GNSS community, a Task force on Geodetic references has been recently (dec
2008) established by the International Committee for GNSS (ICG)
Within the metrological community, the Consultative Committee on Time and Frequencies
(CCTF) took a resolution to adopt ITRS, submitted to the International Conference for
Weights and Measurements (CGPM), the relevant inter-governmental organization.
International Terrestrial Reference Frame (ITRF)
Numerous research activities are developed related to ITRF, either as the methodological
level or on quality assessment. More details can be found in the various reports by IERS, in
particular related to ITRF2005 and the new solution in progress, ITRF2008.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
We can mention the relevant chapters of the new GGOS 2020 document, and the organization
by Sakis Dermanis of a session during the Hotine-Marussi symposium in July 2009.
Members
Zuheir Altamimi (France)
Geoff Blewitt (USA)
Claude Boucher (France) President
Nicole Capitaine (France)
Xavier Collilieux (France)
David Coulot (France)
Sakis Dermanis (Greece)
Herman Drewes (Germany)
Johannes Ihde (Germany)
Sergei Klioner (Russia)
Gerard Petit (France)
Hans-Peter Plag (USA)
Jim Ray (USA)
Perguido Sarti (Italy)
Pascal Willis (France)
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Sub-Commission 1.3: Regional Reference Frames
President: João Torres (Portugal)
Introduction
Sub-Commission 1.3 deals with the definitions and realizations of regional reference frames
and their connection to the global International Terrestrial Reference Frame (ITRF). It offers a
home for service-like activities addressing theoretical and technical key common issues of
interest to regional organisations.
In addition to specific objectives of each regional sub-commission, the main objectives of
SC1.3 as a whole are:
•
Develop specifications for the definition and realization of regional reference frames,
including the vertical component with special consideration of gravity data and other
data.
•
Coordinate activities of the regional sub-commissions focusing on exchange and share
of competences and results.
•
Develop and promote operation of GNSS permanent stations, in connection with IGS
whenever appropriate, to be the basis for the long-term maintenance of regional reference frames.
•
Promote the actions for the densification of regional velocity fields.
•
Encourage and stimulate the development of the AFREF project in close cooperation
with IGS and other interested organizations.
•
Encourage and assist, within each regional sub-commission, countries to re-define and
modernize their national geodetic systems, compatible with the ITRF.
Six regional Sub-Commissions compose the Sub-Commission 1.3:
•
Sub-Commission 1.3 a: Europe
•
Sub-Commission 1.3 b: South and Central America
•
Sub-Commission 1.3 c: North America
•
Sub-Commission 1.3 d: Africa
•
Sub-Commission 1.3 e: Asia-Pacific
•
Sub-Commission 1.3 f: Antarctica
In addition, the Working Group on Regional Dense Velocity Fields was created within SC
1.3. This WG aims at joining the efforts of the regional sub-commissions together with the
groups processing local/regional CORS or repeated GNSS campaigns in order to compute a
dense velocity field referenced in a unique global frame.
Overview
The activities of each of the regional Sub-Commissions and the WG Regional Dense Velocity
Fields are reported hereafter.
A summary of those activities and the main results achieved, are summarized as follows.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Sub-Commission 1.3 a: Europe
– The increase of the number of permanent GNSS tracking sites in Europe, (more than
200 EPN stations operated in 2009 by national European institutions) and of the
number of sites which record GLONASS data simultaneously to GPS data and which
stream real time data.
– The release of official updates of the ITRS/ETRS89 coordinates/velocities of the EPN
(EUREF Permanent Network) stations in a regular mode, as a result of the ITRF densification in Europe.
– The creation of the EUREF Special Project “EPN Reprocessing” with the goal of reprocessing the long time series of numerous EPN stations, aiming on a consistent
processing strategy and thus to receive more reliable results.
– The computation and publication of a new realization of the EVRS (European Vertical
Reference System) under the name EVRF2007. This realization was proposed for
adoption by the European Commission as the vertical reference for pan-European geoinformation.
– The continuation of the ECGN (European Combined Geodetic Network). The ECGN
is considered as a European contribution to the IAG Project Global Geodetic Observation System (GGOS).
– The realization of symposia in 2008 (Brussels) and in 2009 (Florence).
Sub-Commission 1.3 b: South and Central America
– The establishment of five associated analysis centres under the responsibility of Latin
American and Caribbean institutions, and an additional experimental associated centre
for computing ionospheric information based on the SIRGAS-CON.
– The organization of SIRGAS-CON in two hierarchical levels, the first one for providing the primary link to ITRF and the second one for densification at national level.
– The reprocessing of the SIRGAS-CON weekly solutions with absolute phase centre
corrections and IGS05 as reference frame and the release of multiyear solutions.
– The start of a systematic study aiming at the improvement of the realization of the
SIRGAS datum by three different strategies.
– The systematic adoption of official geodetic reference system at national level based
on SIRGAS.
– The development of actions in order to promote SIRGAS in the countries that didn’t
adopt it yet, in particular the support to the establishment of new experimental associated analysis centres and the organization of the SIRGAS School on Reference
Systems, under the sponsorship of the IAG and PAIGH.
– The Executive Committee met in Bogotá (2007) and in Montevideo (2008); the
SC1.3b second workshop was held in Montevideo (2008).
Sub-Commission 1.3 c: North America
– The realization of densifications of the ITRF and IGS global networks by weekly combinations of six different regional weekly solutions using different GPS processing
software.
– The generation of the last cumulative solutions (coordinates and velocities) based on
the weekly NAREF combinations to produce new solutions on an annual basis.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
– The reprocessing of regional solutions prior to GPS Week 1400 using the new IGS
procedures and absolute antenna phase centre variation models is underway.
– The continuation of the efforts aiming at the definition of a plate-fixed regional reference frame for North America stable at the sub-mm level. An updated version of the
frame is currently under development and is expected to be released mid-2009. Two
workshops on this subject were realized.
– The continuation of the activities related to the definition and maintenance of the relationships between international and North American reference frames/datums. Recent
activities have focused on education and outreach efforts.
– The re-activation of the working group related to the maintenance of the vertical
datum for the management of the Great Lakes water system, taking also into consideration the need to update the International Great Lakes Datum by 2015.
Sub-Commission 1.3 d: Africa
– The Steering Committee met several times. The most significant one was a joint meeting held in June 2008 in Johannesburg which brought together representatives from
the fields of seismology, meteorology, space weather, geophysics and geodesy.
– The progress made with the installation of permanent GNSS reference stations. These
have been installed by National Mapping Agencies, Universities and research groups.
– The creation of an Operational Data Centre (ODC) for AFREF with an open data
policy, expected to be operational within the second half of 2009.
– The realization of two training courses in 2007 and 2008 at the Regional Centre for
Mapping of Resources for Development (RCMRD), covering the concepts of AFREF
permanent GNSS reference stations, reference frames and the processing of GNSS
data. A similar course is to be held in August 2009 but with a greater emphasis on the
practical aspects of the project.
– The application for funding submitted to the African Union Commission (AUC) and
European Union (EU) for inclusion within the EU/ AU Lighthouse Projects.
Sub-Commission 1.3 e: Asia-Pacific
– The realization of an annual geodetic observation campaign in order to densify the
ITRF in the Asia-Pacific Region and to provide an opportunity to connect to national
geodetic networks and to determine site velocities. These campaigns have focussed on
GPS observations but incorporated also other geodetic techniques, SLR and VLBI.
– The realization of additional annual, regional, GPS campaigns in 2007 and 2008, for
both scientific research and local applications. Results from these campaigns have
been submitted to the IAG Working Group on “Regional Dense Velocity Fields.
– The contribution to enhance the regional geodetic infrastructure, to encourage the
transfer of GPS technology and sharing of analysis techniques to nations in need.
– The promotion of the application of new geodetic adjustment techniques and datum
transformation parameters for regional spatial data integration and for geo-referencing
cadastral information
– The support for the densification of continuous GPS installations in areas of earthquake and tsunami hazard.
– The meetings held in Seoul (2007), Kuala Lumpur (2008); the next meeting is planned
for Bangkok (2009).
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Sub-Commission 1.3 f: Antarctica
– The realization of SCAR GPS Campaigns in 2008 and 2009. The data of 34 Antarctic
sites are collected in the SCAR GPS database beginning with the year 1995.
– The continuation of data analyses and presentation of the results at the XXX SCAR
Meeting (2008) and at the EGU Meeting (2009).
– The meeting that took place during the XXX SCAR Meeting, resulting in the working
plan of the SCAR Group of Experts on Geodetic Infrastructure in Antarctica (GIANT)
for the years 2008-2010.
– The active participation in the project POLENET (Polar Earth Observing Network), in
the frame of the International Polar Year 2007/2008.
– Working Group on Regional Dense Velocity Field
– The WG appointed for each region a region coordinator to gather velocity solutions
for their region (in accordance with the WG requirements) to produce one regional
combined velocity solution. A first set of preliminary regional combined solutions is
prepared for June 2009.
– The preliminary solution resulting from the combination of the preliminary regional
SINEX solutions with long-term solutions from global networks will serve to identify
problems and help to set strategic choices and guidelines. Some problems encountered
up to now are being solved. A new solution is expected to be issued in 2010-2011.
– The WG met in Miami Beach (2008), San Francisco (2008) and Vienna (2009). A
website has been set up providing a gateway to the WG activities.
Conclusion
The activities of each of the regional Sub-Commissions and the WG Regional Dense Velocity
Fields show that all the components of the structure are developing according to the main
objectives of the SC 1.3.
Some general aspects deserve to be referred:
– The activities are contributing to the scientific and technical development in several
topics such as GNSS analysis and processing, precise reference frame establishment,
among others.
– The organizational aspects play a more and more important role and are crucial for the
efficient achievement of results.
– There is a great effort to bring together different types of institutions (R&D structures,
National Mapping Agencies, political and economic agencies, etc.) to support the
realization of international campaigns (GNSS and other space techniques) and the
installation of continuously observing GNSS sites.
– The products delivered are used not only by the scientific community but are also
being used to define world-wide national reference frames related to the ITRF.
There is a concern to develop education and training events, especially in less developed
regions and countries. This effort must be continued and supported by the IAG.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Sub-Commission 1.3a: Regional Reference Frame for Europe (EUREF)
Chair: Johannes Ihde (Germany)
Introduction
The long-term objective of EUREF, as defined in its Terms of Reference “is the definition,
realization and maintenance of the European Reference Systems, in close cooperation with the
pertinent IAG components (Services, Commissions, and Inter-Commission projects) as well
as EuroGeographics”. (www.euref-iag.net)
The results and recommendations proceeding from EUREF support the use of the European
Reference Systems in all scientific and practical activities related to precise geo-referencing
and navigation, Earth sciences research and multidisciplinary applications. EUREF makes use
of the most accurate and reliable terrestrial and space-borne techniques available, and
develops the necessary scientific background and methodology. Its activities are focused on a
continuous innovation and on the changing user needs, as well as on the maintenance of an
active network of people and organizations, and may be summarized as follows:
•
to maintain the ETRS89 (European Terrestrial Reference System) and the EVRS
(European Vertical Reference System) and upgrade the respective realizations;
•
to refine the EUREF Permanent Network (EPN) in close cooperation with the IGS;
•
to improve the European Vertical Reference System (EVRS);
•
to contribute to the IAG Project GGOS (Global Geodetic Observing System) using the
installed infrastructures managed by the EUREF members.
These activities are reported and discussed at the Technical Working Group (TWG) Meetings
and annual EUREF Symposia, an event that occurs every year since 1990, with an attendance
of about 100 participants coming from more than 30 countries in Europe and other continents,
representing universities, research centers and the NMCA (National Mapping and Cadastre
Agencies). It's an open forum, and may be attended by any person interested in the work of
the Sub-Commission. The organization of the EUREF Symposia has been and will be
supported by EuroGeographics, the consortium of the European National Mapping and
Cadastral Agencies, reflecting the importance of the EUREF work for practical purposes. This
involvement is consolidated since 2007 by a formal liaison between EUREF and EuroGeographics. The EUREF symposium 2008 took place in Brussels, Belgium and in 2009 in
Florence, Italy.
EUREF Permanent GNSS Network (EPN)
The EPN is a permanent GPS network created by the IAG Sub-commission for Europe
(EUREF). Its primary objective is the creation and maintenance of the European Terrestrial
Reference System ETRS89. The EUREF Technical Working Group (TWG) is responsible for
the general management of the EPN. The EPN Coordination Group and the EPN Central
Bureau implement the operational policies of the EUREF TWG.
The EPN consists of a well-determined structure including GPS tracking stations, operational
centers, local and regional data centers, local analysis centers, a combination centre and a
central bureau. The EPN is the European densification of the network operated by the International GPS Service (IGS). As such, the EPN uses the same standards and exchange formats
as the IGS.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Special Projects are set up by the EPN Coordination Group in order to introduce new applications into the EUREF Permanent Network or study special aspects of the permanent network.
The different EPN components (such as the tracking stations, data centers and analysis
centers) follow specific guidelines. Candidate EPN stations can also find the necessary
instructions for becoming an EPN station. (www.epncb.oma.be)
The number of permanent GNSS tracking sites in Europe has grown considerably, more than
200 EPN stations are operated in 2009 by national European institutions. The number of sites
which record GLONASS data simultaneously to GPS data and which stream real time data is
steadily increasing.
EUREF Permanent GNSS Network EPN
EUREF Densification of the ITRF
Even while the number of permanent GNSS tracking sites in Europe has grown considerably
(more than 200 EPN stations in 2009), only a selection of these sites (mostly the ones belonging to the International GNSS Service – IGS) have coordinates included in recent ITRF
realizations.
The latest realization of the ITRS, ITRF2005, is based on observations from space geodetic
techniques (GNSS, DORIS, VLBI, and SLR) up to December 2005 and does not take into
account any of the IGS/EPN data gathered after Jan 1st, 2006. Consequently it cannot reflect
the most recent status of the EPN (e.g. antenna changes). The limited number of stations and
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
the lack of frequent updates limit therefore the use of the ITRF for EUREF densifications. In
addition, the ITRF2005 has been computed with relative GNSS antenna models and coordinate offsets between solutions based on absolute antenna models and the ITRF2005 are
significant. This problem will be resolved with the release of the ITRF2008 (expected for
2009) which will be compatible with absolute GNSS antenna models.
To take full advantage of the EPN and its most recent GNSS observation data, the EUREF
TWG decided at its meeting of Nov. 3-4, 2008 in Munich, to release regular official updates
of the ITRS/ETRS89 coordinates/velocities of the EPN stations. A first step in this process
consisted in a densification of the ITRF2005 using all EPN data up to Dec. 2005 (the same
observation period as covered by the ITRF2005). This release (Kenyeres, 2008) known as
EPN_C1355 (ITRF2005) for the ITRS and the corresponding EPN_C1355 (ETRF2000) for
the ETRS89 has been distributed to the EUREF community through EUREF mail 4142 on
Dec. 12, 2008. As decided at the EUREF TWG meeting of Feb. 26-27 2009 in Budapest, this
densification is replaced each 5 weeks by a new EUREF realization of the ITRF. The
advantage of regularly updating the realization is that the most recent EPN results are taken as
much as possible into account.
EPN reprocessing activities
Inconsistencies in the long coordinates and time series are occurring, especially after changes
of the modeling parameters. The plan to reprocess the long time series of numerous EPN
stations aims on a consistent processing strategy and thus to receive more reliable results. A
first attempt for reprocessing has been carried out by the Potsdam-Dresden-Group for the data
sets from 1994 to 2007. On a call for participation all invited LACs declared to be willing to
participate in this project. The majority of the EPN LACs is using the Bernese Software,
some; however, make their data processing by other software packages. The comparison of
the results basing on identical input data would be of special interest. The TWG finally
decides to define a new EUREF Special Project “EPN Reprocessing”. It is agreed that
possibly several steps of subsequent solutions will be necessary to yield a satisfying result.
The TWG has formed a Working Group with about 10 members (LACs, members of large) to
investigate this problem in detail. A call for participation should be sent out inviting everybody who is interested and ready to contribute is invited to participate.
European Vertical Reference System (EVRS)
Since 1994 the IAG Sub-commission for Europe (EUREF) have enhanced the Unified European Leveling Network (UELN) and defined a European Vertical Reference System (EVRS).
Half of the participating countries provided new national leveling data to the UELN data
centre after the release of the last solution EVRF2000. Therefore a new realization of the
EVRS was computed and published under the name EVRF2007. The datum of EVRF2007 is
realized by 13 datum points distributed over the stable part of Europe. The measurements
have been reduced to the common epoch 2000 using the land uplift model of the Nordic Geodetic Commission (NKG). The results of the adjustment are given in geopotential numbers
and normal heights, which are reduced to the zero tidal system. At the EUREF symposium
June 2008 in Brussels Resolution No. 3 was adopted which proposes to the European Commission that EVRF2007 is adopted as the vertical reference for pan-European geo-information.
The availability of EVRF2007 necessitates an update of the Geodetic Information and Service
System CRS. Transformation parameters between national height systems and EVRF2007
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
will be calculated and provided at http://crs.bkg.bundde/crs-eu/ before the end of 2008. After
providing the EVRF2007 results the development of the UELN will be continued.
The delivery of the new leveling network of Spain has been announced for about 2009.
Besides that, a partial re-measurement of the French leveling network (NIREF) has been performed.
EVRF2007
ECGN continuation
The ECGN is considered as a European contribution to the IAG Project Global Geodetic
Observation System (GGOS). The primary concern of the project consists in connecting the
height component with the gravity determination while allowing for measuring data that are
acquired in the European coastal regions and above adjacent seas. As objectives of the ECGN
as an integrated European Reference System for Spatial Reference and Gravity are to be
noted:
− maintenance of a long term stability of the terrestrial reference system with an accuracy of 10'-9 for Europe especially in the height component,
− in-situ combination of geometric positioning (GPS) with physical height and other
Earth gravity parameters in 1 cm accuracy level,
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
− modeling of influences of time-dependent parameters of the solid Earth, of the Earth
gravity field, the atmosphere, the oceans and the hydrosphere for different applications
of positioning.
− the modeling of gravity field components to validate the satellite gravity missions
CHAMP, GRACE and GOCE,
− present a platform for further geo-components (GMES, GEOSS. GGOS).
As input data the records of techniques such as VLBI, SLR, GNSS, DORIS, leveling, tides
gauges, gravimeters (absolute, superconducting, spring) are mentioned. Initially about 70
stations were selected to form the ECGN, later the number was reduced to about 50 as the
other ones turned out to be not suitable.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Sub-Commission 1.3b:
Regional ReferenceFrame for South and Central America (SIRGAS)
Chair: Claudio Brunini (Argentina)
SC1.3b-WG1 (Reference Frame) chair:
SC1.3b-WG2 (Geocentric Datum) chair:
SC1.3b-WG3 (Vertical Datum) chair:
Vice-chair: Laura Sánchez (Germany)
current: Virginia Mackern (Argentina)
Former: Sonia Costa (Brazil)
current: William Martínez (Colombia)
Former: Tomas Marino (Costa Rica)
current: Roberto Luz (Brazil);
Former: William Martínez (Colombia)
Sub-commission 1.3b (Latin America and Caribbean) encompasses the activities developed
by the “Geocentric Reference System for the Americas” (SIRGAS) initiative, whose main
objective is the definition and realization of unified reference frame for the region (SC1.3.b –
WG1). Besides, SIRGAS promotes the establishment of national densifications of the continental frame (SC1.3b – WG2), and the definition and realization of a unified and globally
consistent vertical reference system for the region supporting physical and geometrical
heights (SC1.3b – WG3).
The SC1.3b Executive Committee met in two opportunities for evaluating the ongoing and
forthcoming activities. The first meeting was held in Bogotá (Colombia), on June 7 – 8, 2007
(reported in SIRGAS Newsletter No 12); and the second one in Montevideo (Uruguay), on
May 28 – 30, 2008 (reported in SIRGAS Newsletter 13). In addition, the SC1.3b – WG1 held
its second workshop in Montevideo (Uruguay), on May 26 – 27, 2008, intended to improve
the strategy used by the associated analysis centres.
As already informed in the previous report of this SC, during the first SC1.3b – WG1 workshop (Rio de Janeiro, Brazil, August 16 – 18, 2006), five associated analysis centres were
established under the responsibility of Latin American and Caribbean institutions, namely:
IGN and IGG-CIMA (Argentina), IBGE (Brazil), IGAC (Colombia), and INEG (Mexico).
Soon after, an experimental period started aimed to assess the reliability of those centres (in
the meantime, the DGFI continued to be in charge of the official processing of the entire network as IGS – RNAAC – SIR). An additional experimental associated centre was established
at the UNLP (Argentina) for computing ionospheric information based on the SIRGAS continuously observing GNSS network (SIRGAS-CON).
The results of the above mentioned experiment were evaluated during the second SC1.3b –
WG1 workshop. Based on that assessment, the SIRGAS Executive Committee approved the
following actions items that were immediately translated into the practice:
1. The status of the IGG-CIMA, IBGE, IGAC and UNLP associated analysis centres was
changed from experimental to official.
2. SIRGAS-CON was divided in two hierarchical levels (Figure 1.3b.1): a core one
(SIRGAS-CON-C), intended to provide the primary link to ITRF; and a densification
one (SIRGAS-CON-D), which encompasses all the fundamental stations of the
national networks and facilitates the accessibility to the reference frame. The D-network was further divided in three sub-networks identified as North (N), Middle (M)
and South (S). All the stations included in C and Ds networks match the ITRF requirements.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
3. The computation of the C-network was in-charged to DGFI, while the computation of
the D-networks was in-charged to IGAC (D-N), IBGE (D-M), and IGG-CIMA (D-S).
4. All the networks (C+Ds) are weekly combined in a common solution by a combination centre under the DGFI responsibility; a second combination centre under the
IBGE responsibility provides redundancy and back-up.
Figure 1.3b.1: SIRGAS-CON network: core and densification sub-networks.
Since August 31, 2008, each associated analysis centre delivers to the combination centres
loosely constrained solutions for the assigned sub-network. All the sub-networks are individually aligned to the IGS05 reference frame by applying NNR + NNT conditions, and compared to IGS weekly values and to each other, in order to identify and reduce possible outliers
from the individual normal equations. Later on, individual normal equations are accumulated
and solved for computing a loosely constrained weekly solution for station coordinates, which
is submitted to IGS for the global polyhedron and used to compute multiyear solutions for
SIRGAS. Besides, a weekly solution constrained to IGS weekly coordinates is also computed
and delivered to users.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
At present, the main weakness of this strategy are caused by the facts that: i) SIRGAS-CON
stations are unequally weighted in the weekly combinations because not all of them are
included in the same number of individual solutions; ii) the redundancy to ensure that each
station is processed by at least three processing centres is not fulfilled; iii) all the analysis
centres use the same processing software. Actions are being undertaking for overcoming these
limitations in the near future.
The SIRGAS-CON weekly solutions from January 2000 to November 2006 computed with
relative phase centre corrections and referred to former ITRF solutions have been reprocessed
including absolute phase centre corrections and IGS05 as reference frame. This provides
homogeneously precise point positions and velocities for all SIRGAS-CON stations.
Periodically, as in-charged of the IGS-RNAAC-SIR, DGFI computes a new multiyear solution. The latest one, identified as SIR09P01, was released on June 2009 and encompasses all
the weekly solutions provided by the associated analysis centres from January 2, 2000 (GPS
week 1043) to January 3, 2009 (GPS week 1512). It is referred to IGS05 at 2005.0, precision
was estimated to be better than ±0.5 mm (horizontal), ±0.9 mm (vertical) and ±0.8 mm/a
(linear velocities). A loosely constrained version of this solution was delivered to the IAG
SC1.3 Working Group on Regional Dense Velocity Fields as the SIRGAS contribution.
Recently, SC1.3b – WG1 performed a systematic study aimed to improve the realization of
the SIRGAS datum. Three different strategies (NNR + NNT, constrained coordinates, and
fixed coordinates) in combination with two different kinds of control coordinates (IGS weekly
solutions, and IGS05 + linear velocities) were applied to a time series spanning from October
2006 (GPS week 1395) to December 2008 (GPS week 1512). Preliminary results have been
described in an internal report that is being considered by the SIRGAS Steering Council with
the aim of presenting some recommendation to the Executive Committee, during the next
meeting that will be held in Buenos Aires, in conjunction with the IAG General Assembly.
At present, 13 of the 18 countries that participate in SC1.3b adopted an official geodetic reference system based on SIRGAS (Figure 1.3b.2). A great and successful effort is being carried
out in order to increase the involvement in SC1.3b of a few South American countries and the
majority of Central America and Caribbean countries, whose participation has not been as
intense as desired. The expected target is that all the countries in the region can implement inhouse facilities to maintain their national reference frames according to modern Geodesy the
state-of-the-art. Two major actions are being performed in order to achieve that objective:
1. Promoting and supporting the establishment of new experimental associated analysis
centres under the responsibility of Latin American and Caribbean institutions. At
present, there are five centres in this category, namely: INEG (México), IGN
(Argentina), IGM (Ecuador), LUZ (Venezuela), SGN (Uruguay). SC1.3b supports this
enterprise by institutional agreements that facilitate the acquisition of processing software and providing training on its use. Training courses of this type have already
taught for the experimental analysis centres installed or being installed in Ecuador,
Uruguay, Peru and Chile.
2. The SIRGAS School on Reference System, which aims to provide the attendant with
fundamental concepts needed for the appropriate generation and use of fundamental
geodetic data. The first edition of this school will be held in Bogotá (Colombia), from
July 13 to 17, 2009, under the sponsorship of the IAG and PAIGH. The program
covers: i) geodetic reference systems; ii) coordinates determination from Global
Navigation Satellite Systems (GNSS); iii) link between heights obtained from GNSS
and those based on spirit levelling; iv) Geocentric Reference System for the Americas
(SIRGAS); and v) spreading and application of SIRGAS products.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Figure 1.3b.2: National densification of SIRGAS.
SC1.3b-WG3 activities are integrated in the IAG Inter Commission Project 1.2, “Vertical
Reference Frames” and were focused on two major issues: i) determination of a reliable geopotential value W0 within a global realization; and ii) evaluation of levelling data combined
with gravimetric measurements, including the direct connection of the first levelling networks
between neighbouring countries and the levelling of the SIRGAS2000 realization. These
activities are complemented by the formulation of a combined system of observation equations based on spirit levelling, GNSS positioning, and geoid determination. It includes the
common analysis of tide gauge registrations, satellite altimetry observations, and GNSS
positioning at those tide gauges which serve as vertical datum in the classical height systems.
This analysis is carried out in the frame of the IGS TIGA project.
SC1.3b has been represented in the following meetings:
SIRGAS: an international collaborative enterprise of the geodetic community in Latin America and the
Caribbean. C. Brunini, L. Sánchez, H. Drewes, W. Martínez. In: United Nations/Azerbaijan/European Space
Agency/United States of America Workshop on the Applications of Global Navigation Satellite Systems. Baku,
Azerbaijan. May 11- 15, 2009.
SIRGAS: ITRF densification in Latin America and the Caribbean. L. Sánchez, C. Brunini, S. Costa, V. Mackern,
W. Martinez, W. Seemüller, A. da Silva. In: European Geosciences Union, General Assembly 2009 (EGU 2009).
Vienna, Austria. April 19 - 24, 2009.
SIRGAS: Base para las Geociencias, la Geoinformación y la Navegación. C. Brunini, L. Sánchez, H. Drewes. In:
Reunión Científica 24 de la Asociación Argentina de Geodesia y Geofísica (AAGG). Mendoza, Argentina. April
14 - 17, 2009.
SIRGAS: Basis for Geosciences, Geodata, and Navigation in Latin America. C. Brunini, L. Sánchez. In: Semana
Geomática Internacional. Barcelona, Spain. March 3 - 5, 2009.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
SIRGAS report on the activities related to the IAG Working Group 'Regional Dense Velocity Fields' . L.
Sánchez. In: Informal meeting of the IAG Working Group 'Regional Dense Velocity Fields'. AGU Fall Meeting.
San Francisco, USA. December 15 - 19, 2008.
SIRGAS: reference frame for the GNSS applications in Latin America. L. Sánchez, C. Brunini. Presented by R.
Neilan. In: Third Meeting of the International Committee on Global Navigation Satellite Systems (ICG).
Pasadena, California, USA. December 8 - 12, 2008.
SIRGAS: Basis for Geosciences, Geodata, and Navigation in Latin America. L. Sánchez, C. Brunini. In:
International Symposium on Global Navigation Satellite Systems, Space-based and Ground-based Augmentation
Systems and Applications. Berlin, Germany. November 11 - 14, 2008.
Global vertical datum unification based on the combination of the fixed gravimetric and the scalar free geodetic
boundary problems. L. Sánchez. In: IAG International Symposium on Gravity, Geoid and Earth Observation.
Chania, Crete, Greece. June 23 - 27, 2008.
The Geocentric Reference System of the Americas (SIRGAS). C. Brunini, L. Sánchez. In: United
Nations/Colombia/United States of America Workshop on the Applications of Global Navigation Satellite
Systems. Medellin, Colombia. June 23 - 27, 2008.
IAG Sub commission 1.3b SIRGAS reference system: Ongoing activities. C. Brunini, L. Sánchez. Presented by
M. Craymer. In: AGU 2008 Joint Assembly. Fort Lauderdale, Florida, USA. May 27 - 30, 2008.
The new position and velocity solution DGF07P01 of the IGS Regional Network Associate Analysis Center for
SIRGAS (IGS RNAAC SIR). W. Seemüller, M. Krügel, H. Drewes, A. Abolghasem. In: AGU Fall Meeting. San
Francisco, USA. December 10 - 14, 2007.
SIRGAS operations and the regional local cores network scene. S. A. Costa. In: 6th FIG Regional Conference.
San Jose, Costa Rica. November 12 - 15, 2007.
SIRGAS: Sistema de Referencia Geocéntrico para las Américas C. Brunini. In: SDI Americas Symposium:
Concepts, Practices, and Projects. IGAC-IPGH-GSDI. Bogota, Colombia. November 7 - 8, 2007.
The most relevant information regarding SC1.3b, related newsletter, presentations and papers, as well access to
its main products can be found in the web at www.sirgas.org.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Sub-Commission 1.3c:
Regional Reference Frame for North America (NAREF)
Co-Chairs: Richard Snay (USA), Michael Craymer (Canada)
This sub-commission is composed of three active working groups and one inactive working
group to be reactivated in 2009. The following summarizes the activities of each. For more
information and publications related to these working groups, visit the regional SubCommission web site at <http://www.naref.org/>.
SC1.3c-WG1: North American Reference Frame (NAREF)
The objective of this WG is to densify the ITRF and IGS global networks in the North
American region. The densification consists of weekly combinations of six different regional
weekly solutions across the entire continent using four different GPS processing software.
Current contributors and some details of their solutions are given in the following table.
NAREF weekly regional coordinate solution contributions.
Contributor
Software
Region
No. Stations (approx.)
MIT
GIPSY & Bernese
Combo
Western North America
1100+
(~520+ used)
NGS
PAGES
US & territories & exico
(CORS network)
1200+
NRCan/GSD
Bernese
Canada & border areas
of US & Greenland
200
NRCan/GSD
GIPSY
Canada
45
NRCan/GSC
Bernese
Western Canada
75
Scripps
GAMIT
North America
1100+
(~625 used)
A number of sites have been omitted from the combination of submitted contributions due
mainly to problems with antenna heights. Investigations are being planned to resolve these
issues. Many other stations have been removed from the MIT and Scripps solutions because
of software limitations and the very high density of sites in southern California and some local
areas of the PBO network. Presently, only those stations in the U.S. common with the NGS
CORS solution are being included in the current weekly combinations. To better align the
NAREF combinations to the ITRF, a subset of global sites have been included in all but the
NRCan/GSC solutions since GPS Week 1400. Due to delays in submissions of some of the
regional solutions since GPS Week 1400, the weekly combinations are not yet up to date.
These weekly combination solutions are available from the IGS and the NAREF FTP archive.
To date, cumulative solutions (coordinates and velocities) based on the weekly NAREF
combinations have been generated on an as required basis but the intention is to produce new
solutions on an annual basis. The last cumulative solution based only on data up to GPS Week
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
1399 due to the change in IGS processing procedures and their adoption of absolute antenna
phase centres.
NAREF network since GPS Week 1400 with global sites used to align with ITRF.
A major reprocessing effort of regional solutions prior to GPS Week 1400 is presently
underway by Scripps and NGS using the new IGS procedures and absolute antenna phase
centre variation models. These regional solutions have essentially been a densification of their
global reprocessing efforts for the IGS. Both have already reprocessed several years of data.
The other contributors plan to begin reprocessing their regional solutions using the final
reprocessed IGS orbits once they become available.
SC1.3c-WG2: Stable North American Reference Frame (SNARF)
Significant efforts continued under this joint working group with UNAVCO, Inc. in support
of the EarthScope project. The goal of the WG is to define a plate-fixed regional reference
frame for North America stable at the sub-mm level in order to provide a standardized and
consistent reference frame in support of geodynamics studies throughout the continent. Nine
workshops to define the reference frame have been held since 2004, including two during this
reporting period.
The SNARF frame is being defined via a no net rotation condition for a set of stable frame
sites with respect to the ITRF. A novel technique has been used to assimilate GPS velocity
solutions together with a geophysical model of glacial isostatic adjustment to model both
horizontal and vertical intra-plate motions. The first version of the reference frame was
released at the UNAVCO Annual Meeting in June 2005.
An updated version of the frame is currently under development using several improved
velocity solutions from the members of the WG, including the last official NAREF solution
up to GPS week 1399. This version of SNARF is expected to be released mid-2009. In
addition to a reference frame (coordinates and velocities) with uncertainties, a model for
glacial isostatic adjustment and plate rotation rates with respect to ITRF2000 will also be
provided.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
SC1.3c-WG3: Reference Frame Transformations
This sub-commission is concerned with the definition and maintenance of the relationships
between international and North American reference frames/datums. This primarily involves
maintaining the officially adopted relationship between ITRF and NAD83 in Canada and the
U.S. The NAD83 frame is now defined in terms of a fourteen parameter transformation from
ITRF96. Transformations from/to other subsequent versions of ITRF are obtained by updating
the NAD83-ITRF transformation with the official incremental fourteen parameter transformations between ITRF versions as published by the IERS. In 2006 the transformation was
updated with the introduction of ITRF2005. Recent activities have focused more on education
and outreach efforts.
Later in 2009 it is expected that a new ITRF2008 will be introduced. At that time, a revised
version of the NAD83-ITRF transformation will be determined for use in both Canada and the
U.S.
SC1.3c-WG4: International Great Lakes Datum
The purpose of this working group is to consider problems related to the maintenance of the
vertical datum for the management of the Great Lakes water system, including post-glacial
rebound, the use of GPS/geoid techniques, lake level transfers through hydrodynamic models,
comparisons with NAVD88 and the implementation of a revised height system by 2015.
This sub-commission has been inactive since the inception of the NAREF sub-commission.
However, with plans for height modernization in both Canada and the U.S., and the need to
update the International Great Lakes Datum by 2015 due mainly to the effects of glacial
isostatic adjustment, it has been decided to re-activate the working group in the near future to
address the issued faced in adopting a new geoid-based IGLD.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Sub-Commission 1.3d: Regional Reference Frame for Africa (AFREF)
Chair: Richard Wonnacott (South Africa)
Introduction
IAG Sub-Commission 1.3d (Africa) of Commission 1 Reference Networks was established
with the objective:
– To establish a continental reference system for Africa consistent and homogeneous
with the global reference frame of the ITRF as a basis for national 3-d reference
networks;
– To realize a unified vertical datum and to support efforts to establish a precise African
geoid;
– To establish continuous, permanent GPS base stations at a spacing such that users will
be within 1000km of a base station and that data is freely available to all nations;
– To provide a sustainable development environment for technology transfer so that
these activities will enhance the national networks and other applications;
– To understand the necessary geodetic requirements of participating national and international agencies;To determine the relationship between the existing national
reference frames and the ITRF to preserve legacy information based on existing
frames; andTo assist in establishing in-country expertise for implementation,
operation, processing and analysis of modern geodetic techniques, primarily GNSS.
While AFREF is an African project which is to be designed, managed and executed by
African countries, these objectives are to be carried out with the technical assistance and in
collaboration with the IAG community and its service organization, the IGS, together with the
National and Regional Mapping Organizations of Africa. Although many of these objectives
have not been met during the review period, progress has been made with the installation of
permanent GNSS reference stations and a number of the other objectives such as the transfer
of technology through training programmes and to broaden the understand the geodetic and
GNSS requirements of a number agencies and projects engaged in disciplines other than
geodesy.
Installation of Permanent GNSS Stations
Since July 2007, the number of permanent GNSS reference station installations has increased
throughout Africa. These have been installed by National Mapping Agencies, Universities and
research groups. In spite of the number of installations increasing, there remains a difficulty in
knowing where stations have been installed, who has installed them, what standards have
been used and where data is being archived. Although stations have been installed in the name
of AFREF, some groups are withholding data for their own use which defeats the objectives
and principles of the IGS which are also the fundamental principles of AFREF.
At a recent AFREF Steering Committee meeting in Addis Ababa in April 2009, the Chief
Directorate: Surveys and Mapping in South Africa offered to take on the role of Operational
Data Centre (ODC) for AFREF. This will create a single data base for AFREF which will
have an open data policy. Data will be mirrored to the Regional Data Centre at the Hartebeesthoek Radio Astronomy Observatory and one of the IGS Global Data Centres. It is trusted
that the AFREF ODC will be operational within the second half of 2009.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Meetings and Training Courses
A number of Steering Committee meetings were held during the reporting period but perhaps
the most significant was a joint meeting held in June 2008 in Johannesburg which brought
together representatives from the fields of seismology, meteorology, space weather,
geophysics and geodesy. The groups that met were
– AFREF
(geodesy)
– Africa Array
(seismology and geophysics)
– AMMA-GPS
(meteorology)
– SCINDA/ IHY
(space weather)
– Universities
(geophysics)
All these groups have a common interest in and requirement for GNSS data and it is felt that
with a common understanding and by working in a collegial environment, the groups should
be able to share resources and expertise.
Two training courses were held, one in August 2007 and the second in Aug 2008 both at the
Regional Centre for Mapping of Resources for Development (RCMRD). The courses covered
the concepts of AFREF permanent GNSS reference stations, reference frames and the
processing of GNSS data. The courses were run by RCMRD in conjunction with Hartebeesthoek Radio Astronomy Observatory and the University of Beira in Portugal. A similar
course is to be held in August 2009 but with a greater emphasis on the practical aspects of the
project.
Funding for AFREF
Funding remains one of the main stumbling blocks to significant progress being made with
AFREF. An application for funding was submitted to the African Union Commission (AUC)
and European Union (EU) for inclusion within the EU/ AU Lighthouse Projects. The
application was partially successful but still requires refinement. Apart from this application,
there are a few other direct or indirect sources of support for the project such as the
Millennium Challenge Corporation funding granted to selected low or low middle income
countries for various development projects or the donation of equipment from receiver
manufacturers.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Sub-Commission 1.3e: Regional Reference Frame
for South-East Asia and Pacific
Chair: Shigeru Matsuzaka (Japan)
Overview and Organisation
The Sub-Commission 1.3e continues to maintain a close working relationship with the
Regional Geodesy Working Group of the Permanent Committee for GIS Infrastructure in the
Asia and the Pacific region (PCGIAP) and the Asia Pacific Space Geodynamics project
(APSG). The activities of this Sub-Commission are principally carried out by the members of
national surveying and mapping organisations, in the region, through the PCGIAP, which
operates under the purview of the United Nations Regional Cartographic Conference for Asia
and the Pacific (UNRCC-AP), and through the scientific members of the APSG.
The efforts of the Sub-Commission have provided a regional focus for cooperation in the
definition, realisation and densification of the International Terrestrial Reference Frame
(ITRF). More specifically, the Sub-Commission has sought to:
•
Enhance the regional geodetic infrastructure by contributing to monitoring, warning
and post-event reconstructions through the cooperative observation of crustal deformation and plate motion, and information exchange, including tide gauge networks and
placement of new GPS key sites;
•
Encourage the transfer of GPS technology to nations in need through annual campaign
observations, and the development and sharing of analysis techniques;
•
Promote the application of new geodetic adjustment techniques and datum transformation parameters for regional spatial data integration and for geo-referencing
cadastral information;
•
Interact with IAG commissions 1 and 2 on the status of the regional geodetic reference
frames and geoid determination using absolute gravity, satellite, airborne and
terrestrial gravity; and
•
Support the densification of continuous GPS installations in areas of earthquake and
tsunami hazard and strongly encourage nations to make their geodetic data readily
available.
Outputs
Asia Pacific Regional Geodetic Project (APRGP)
In order to densify the ITRF in the Asia-Pacific Region an annual geodetic observation
campaign has been held to provide an opportunity to connect to national geodetic networks
and to determine site velocities. While these campaigns have focussed on GPS observations,
coordinated through the PCGIAP, they also incorporated other geodetic techniques, including:
Satellite Laser Ranging (SLR) coordinated through cooperation with International Laser
Ranging Service (ILRS) and Western Pacific Laser Tracking Network (WPLTN); and Very
Long baseline Interferometry (VLBI), coordinated through the APSG and International VLBI
Service (IVS). In the period 2007-2009, four geodetic VLBI campaigns have been undertaken
in the region for the APRGP, namely APSG-20 (11 Sep 2007) APSG-21 (10 Oct 2007),
APSG-22 (09 Sep 2008) and APSG-23 (08 Oct 2008).
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Two additional annual, regional, GPS campaigns were undertaken in 2007 and 2008. APRGP
campaigns were coordinated by Geoscience Australia (GA) and the campaign data (1997 –
2008) were collated by Geoscience Australia, and subsequently made available, on request, to
participating countries for analysis. The data from these GPS surveys are available, from
Geoscience Australia, for both scientific research and local applications. The processing of
the APRGP data sets, from the years 1997 to 2006 inclusive, was undertaken by Geoscience
Australia. Results from these campaigns have now been submitted to the IAG working group
on regional dense velocity fields.
Other Activity
Other activities associated with the regional reference frame development include:
•
The 13th PCGIAP meeting was held in Seoul, Korea in June 2007. The 14th PCGIAP
meeting was held in Kuala Lumpur, Malaysia in August 2008. The 15th PCGIAP
meeting will be held in Bangkok, Thailand in October, 2009.
•
China, Japan, Korea and Australia are densifying their GNSS networks;
•
Indonesia and the Philippines are planning to build and/or densify their continuous
GPS networks;
•
Australia has commenced the AuScope Initiative, which includes the construction and
operation of 3 new VLBI stations and 100 new IGS standard GNSS stations;
•
New Zealand has constructed a new geodetic VLBI station;
•
Korea has engaged in a construction of a new geodetic VLBI observatory, 2008-2011;
•
GSI, Japan, has launched a new project: Asia-pacific Crustal Monitoring Project;
•
South Pacific Sea Level Monitoring Project (SPSLMP) installation phase complete, 12
CGPS stations have been collocated with tide gauges. GPS data is publicly available
from Geoscience Australia; and
•
Japan has upgraded its South Pacific (Plume) sites.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Sub-Commission 1.3f: Regional Reference Frame for Antarctica (SCAR)
Chair: Reinhard Dietrich (Germany)
Observation Campaigns
The SCAR GPS Campaigns 2008 and 2009 were carried out in the austral summers 2008 and
2009. All together, the data of 34 Antarctic sites are now collected in the SCAR GPS database
beginning with the year 1995.
Data Analysis
The data analyses continued. All data analyses were carried out with the Bernese GPS
Software, version 5.0. The results were presented at the XXX SCAR Meeting in St.
Petersburg/Russia in July 2008 and at the EGU Meeting 2009 in Vienna.
Meetings
During the XXX SCAR Meeting in St. Petersburg the members of SC1.3f met and the
working plan of the SCAR Group of Experts on Geodetic Infrastructure in Antarctica
(GIANT) was discussed and fixed for the years 2008-2010. R. Dietrich (Germany) was
confirmed as the coordinator of the SCAR GPS Campaigns. The members of GIANT
represent the SC1.3f.
The International Polar Year 2007/2008
The International Polar Year (IPY) 2007/2008 started at 1st of March 2007 and ended at 28th
of February 2009. It was organized jointly by ICSU and WMO, and provided the frame for a
broad range of coordinated, international projects. The SC1.3f actively participated in the
frame of the IPY project POLENET (Polar Earth Observing Network).
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Working Group SC 1.3 - WG 1: Regional Dense Velocity Fields
Chair: Carine Bruyninx
Objectives and Membership
Because of accuracy, ability to provide results in a global reference frame, and low cost of
receivers and versatility, Global Navigation Satellite Systems (GNSS) are presently the main
sensor of the Earth's surface deformation. Consequently, GNSS networks have been installed
all over the world and repeated GNSS campaigns are conducted to monitor ground
deformations. In addition, a large number of Continuous Operating GNSS Reference Stations
(CORS) are operating today for multi-disciplinary applications ranging from surveying to
numerical weather prediction.
The regional sub-commissions within IAG sub-commission 1 "Regional Reference Frames"
have already made a first step in coordinating these activities in order maintain their regional
reference systems.
This Working Group on “Regional Dense Velocity Fields” aims at joining the efforts of the
regional sub-commissions together with the groups processing local/regional CORS or
repeated GNSS campaigns in order to compute a dense velocity field referenced in a unique
global frame. For that purpose the WG has set up the following goals:
• define specifications and quality standards for the regional SINEX solutions and
relevant meta-data;
•
collect SINEX solutions and their meta-data ;
• study in-depth the individual strengths and shortcomings of local/regional and
continuous/epoch GNSS solutions to determine site velocities;
• define optimal strategies for the combination of regional and global SINEX solutions;
• provide dense regional velocity fields;
• provide the densification of the ITRF2005 (or its successor);
• encourage participation in related symposia;
• implement a web site in order to provide information on the activities and access to the
products of the WG
•
and prepare recommendations and a comprehensive final report on the WG activities.
The Working Group brings together representatives of the regional sub-commissions and
experts in the combination of SINEX files. Working Group members are Altamimi Z.
(France), Becker M. (Germany), Bruyninx C. (Belgium), Craymer M. (Canada), Combrink A.
(South Africa), Combrinck L. (South Africa), Dawson J. (Australia), Fernandes R. (Portugal),
Dietrich R. (Germany), Govind R. (Australia), Herring T. (US), Kenyeres A. (Hungary), King
B. (USA), Kreemer C. (USA), Lavallée D. (the Netherlands), Legrand J. (Belgium), Sánchez
L. (Germany), Sella G. (US), and Woppelmann G. (France).
Activities
The goal of the WG is to provide regional dense GNSS-based velocity information in a
common reference frame. The working group is linking its activities with the regional subcommissions within IAG sub-commission 1 “Regional Reference Frames” (AFREF, Asia &
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Pacific, Antarctica, NAREF, SIRGAS, and EUREF). Their expertise, coordination role for
their region, and their capability to generate a unique cumulative solution for their region
including velocity solutions from third parties (even campaigns) is essential for the WG.
The WG thus divided the world in different regions corresponding to the regions of the
different sub-commissions and appointed for each region a region coordinator. The region
coordinators are gathering velocity solutions for their region (in accordance with the WG
requirements) and combine the submitted velocity solutions with GNSS solutions from the
regional sub-commissions to produce one regional combined velocity solution. In addition to
the individual regions, cumulative SINEX solutions from global networks as TIGA are also
used. A first set of preliminary regional combined solutions is prepared for June 2009. Two
working group members have agreed to combine the preliminary regional SINEX solutions
with long-term solutions from global networks such as the IGS and tie the result to the ITRS
anticipating a preliminary WG solution in time for the IAG 2009 meeting in Buenos Aires.
This main goal of this preliminary solution will be to identify the problems that will arise and
help to set strategic choices and guidelines for the future. These guidelines will be used to
issue a new solution in 2010-2011.
The WG issued a call for participation at the end of 2008. Figure 1 shows on a map the
solutions that have been proposed to the Working Group up to date. Not all of them have been
received at this moment at it is expected that some of them will only be available end of 2009.
Figure 1 - Map of the velocity solutions proposed to the Working Group to date. In total about 6000 sites are
included.
The following problems have been encountered up to now:
•
Domes numbers & station names: Not all sites included in the contributing solutions
have official domes numbers attributed by the IERS and this can make SINEX
combination software fail. A coordinated approach for attributing virtual domes
numbers will therefore be necessary. In the case of duplicates station names, a new
station 4 char-ID and virtual DOMES number will also have to be assigned in a
coordinates way avoiding overlaps duplicates and inconsistencies between the
different regions.
•
Solutions with only precise velocity estimates and no precise coordinates: The
implication being that inter-site correlations (negligible in many cases, not so in
others) are not included and some programs designed to merge SINEX files could fail.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
•
Inconsistent solution numbers: The WG recommended in the guidelines that: "For IGS
sites the timing of offsets should be identical to those in use by the IGS". However,
this does not help when solutions have already been produced. A dedicated approach
for this problem will have to be investigated.
Working Group Meetings
•
June 4, 2008, Miami Beach, US (during IGS Analysis Centres Workshop), the minutes
are available from http://www.epncb.oma.be/IAG/documents/minutes/Minutes_
20080604.pdf
•
December 18, 2008, San Francisco, US (AGU 2008 Fall Meeting), the minutes are
available
from
http://www.epncb.oma.be/IAG/documents/minutes/Minutes_
20081218. pdf
April 20, 2009, Vienna, Austria (EGU 2009), the minutes are available from http://
www.epncb.oma.be/IAG/documents/minutes/Minutes_20090420.pdf
•
Outreach
A web site has been set up providing a gateway to the WG activities, including the submission
guidelines, call for participation, list of contributors, etc... It is available from http://www.
epncb.oma.be/IAG/.
Members of the Working Group have presented the activities of the WG at the following
meetings:
•
Sensitivity of the Reference Frame Definition in a Regional Network, C. Bruyninx, J. Legrand; AGU
Fall Meeting 2007, December 10-14, 2007, San Francisco, US
•
Sensitivity of the Reference Frame Definition in a Regional Network, Legrand J., Bruyninx C., Pottiaux
E.; EGU General Assembly 2008, April 14-18, 2008, Vienna, Austria
•
IAG Working Group "Regional Dense Velocity Fields": Objectives and Future Plans, C. Bruyninx, Z.
Altamimi, M. Becker, M. Craymer, L. Combrinck, A. Combrink, R. Fernandes, R. Govind, A.
Kenyeres, B. King, C. Kreemer, D. Lavallée, J. Legrand, L. Sánchez, G. Sella; IGS Analysis Centres
Workshop, June 2-6, 2008, Miami, US
•
IAG Working Group "Regional Dense Velocity Fields": Objectives and Future Plans, C. Bruyninx, Z.
Altamimi, M. Becker, M. Craymer, L. Combrinck, A. Combrink, R. Fernandes, R. Govind, A.
Kenyeres, B. King, C. Kreemer, D. Lavallée, J. Legrand, L. Sánchez, G. Sella; AFREF Workshop, June
17-18, 2008, Johannesburg, South Africa
•
Objectives and Challenges of the IAG Working Group "Regional Dense Velocity Fields", C. Bruyninx,
Z. Altamimi, M. Becker, M. Craymer, L. Combrinck, A. Combrink, R. Fernandes, R. Govind, A.
Kenyeres, B. King, C. Kreemer, D. Lavallée, J. Legrand, L. Sánchez, G. Sella; EUREF 2008
Symposium, June 18-21, 2008, Brussels, Belgium
•
EPN Reference Frame Alignment: Consistency of the Station Positions, Legrand J., Bruyninx C.;
EUREF 2008 Symposium, June 18-21, 2008, Brussels, Belgium
•
Objectives and Challenges of the IAG Working Group “Regional Dense Velocity Fields”, Bruyninx C.,
Z. Altamimi, M. Becker, M. Craymer, L. Combrinck, A. Combrink, R. Fernandes, R. Govind, A.
Kenyeres, B. King, C. Kreemer, D. Lavallée, J. Legrand, L. Sanchez, G. Sella; EUREF 2008
Symposium, June 18-21, 2008, Brussels, Belgium
•
Towards the Provision of Regional Dense Velocity Fields in a Global Reference Frame, C. Bruyninx, Z.
Altamimi, M. Becker, M. Craymer, L. Combrinck, A. Combrink, R. Fernandes, R. Govind, T. Herring,
A. Kenyeres, B. King, C. Kreemer, D. Lavallée, J. Legrand, M. Moore, L. Sánchez, G. Sella, G.
Woppelmann; WEGENER 2008 General Assembly, September 15-18, 2008, Darmstadt, Germany
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
•
IAG Working Group "Regional Dense Velocity Fields": Objectives and Future Plans, C. Bruyninx, Z.
Altamimi, M. Becker, M. Craymer, L. Combrinck, A. Combrink, J. Dawson, R. Fernandes, R. Govind,
T. Herring, A. Kenyeres, R. King, C. Kreemer, D. Lavallée, J. Legrand, L. Sánchez, G. Sella, G.
Woppelmann; AGU Fall Meeting, December 15-19, 2008, San Francisco, US
•
Influence of the Reference Frame Alignment on Station Positions and Velocities: Global or Regional?,
Legrand J., N. Bergeot, C. Bruyninx, G. Wöppelmann, M.-N. Bouin, Z. Altamimi; AGU Fall Meeting,
December 15-19, 2008, San Francisco,
•
Progress of the IAG SC1.3 Working Group in Providing a Dense Global Velocity Field Based on GNSS
Observations, C. Bruyninx, Z. Altamimi, M. Becker, M. Craymer, L. Combrinck, A. Combrink, J.
Dawson, R. Dietrich, R. Fernandes, R. Govind, T. Herring, A. Kenyeres, R. King, C. Kreemer, D.
Lavallée, J. Legrand, L. Sánchez, Z. Shen, G. Sella, G. Woppelmann; EGU General Assembly, April
19-24, 2009, Vienna, Austria
•
Reliability of Regional and Global GNSS Network Solutions Expressed in the Global Reference Frame,
J. Legrand, N. Bergeot, C. Bruyninx, G. Wöppelmann, M.N. Bouin, Z. Altamimi; EGU General
Assembly, April 19-24, 2009, Vienna, Austria
•
Progress of IAG SC1.3 Working Group in Providing a Dense Global Velocity Field Based on GNSS
Observations, C. Bruyninx, Z. Altamimi, M. Becker, M. Craymer, L. Combrinck, A. Combrink, J.
Dawson, R. Dietrich, R. Fernandes, R. Govind, T. Herring, A. Kenyeres, R. King, C. Kreemer, D.
Lavallée, J. Legrand, L. Sánchez, Z. Shen, G. Sella, G. Woppelmann; EUREF symposium, May 27-30,
2009, Florence, Italy
•
A Dense Global Velocity based on GNSS Observations: Preliminary Results, C. Bruyninx, Z.
Altamimi, M. Becker, M. Craymer, L. Combrinck, A. Combrink, J. Dawson, R. Dietrich, R. Fernandes,
R. Govind, T. Herring, A. Kenyeres, R. King, C. Kreemer, D. Lavallée, J. Legrand, L. Sánchez, G.
Sella, Z. Shen, G. Wöppelmann; IAG 2009 Scientific Assembly, 31 August – 4 September 2009, Buenos
Aires, Argentina
•
Comparison of Regional and Global GNSS Position and Velocity Solutions, J. Legrand, N. Bergeot, C.
Bruyninx, G. Wöppelmann, A. Santamaria-Gomez, M.N. Bouin, Z. Altamimi; IAG 2009 Scientific
Assembly, 31 August – 4 September 2009, Buenos Aires, Argentina
and the following papers have been written:
•
Bruyninx C., Z. Altamimi, M. Becker, M. Craymer, L. Crombrinck, A. Crombrink, R. Fernandes, R.
Govind, A. Kenyeres, B. King, C. Kreemer, D. Lavallée, J. Legrand, L. Sanchez, G. Sella, Objectives
and Challenges of the IAG Working Group “Regional Dense Velocity Fields”, Proc. EUREF
symposium, July 2008, Brussels (in press)
•
Legrand J., Bruyninx C., EPN Reference Frame Alignment: Consistency of the Station Positions,
Submitted to Bulletin of Geodesy and Geomatics (in press)
•
Legrand J., N. Bergeot, C. Bruyninx, G. Woppelmann, M.-N. Bouin, Z. Altamimi , Impact of the
Reference Frame Definition on Geodynamic Interpretations, Submitted to Journal of Geodynamics (in
press)
•
Progress of IAG SC1.3 Working Group in Providing a Dense Global Velocity Field Based on GNSS
Observations, C. Bruyninx, Z. Altamimi, M. Becker, M. Craymer, L. Combrinck, A. Combrink, J.
Dawson, R. Dietrich, R. Fernandes, R. Govind, T. Herring, A. Kenyeres, R. King, C. Kreemer, D.
Lavallée, J. Legrand, L. Sánchez, Z. Shen, G. Sella, G. Woppelmann, Proc. EUREF symposium,
Florence, Italy (in press)
and WG members have been co-chairing of session
•
"Multi-GNSS & regional combined IGS products” at IGS Analysis Workshop, Miami Beach, June 2008
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Sub-Commission 1.4:
Interaction of Celestial and Terrestrial Reference Frames
President: Harald Schuh (Austria)
The main objective of the IAG Sub-Commission 1.4 is the study of the interaction of the
celestial and the terrestrial reference frames. In particular, SC 1.4 is focusing on the consistency between the frames. Sub-Commission 1.4 has established three Working Groups.
WG 1.4.1 Theoretical Aspects of the Celestial Reference System and Systematic Effects
in the CRF Determination (Chair: Zinovy Malkin)
WG members: Z. Malkin (Chair), N. Capitaine, A. Fey, A.-M. Gontier, S. Klioner, D.
MacMillan, J. Sokolova, O. Titov, V. Zharov, ex officio: H. Schuh, Chair of IAG SC 1.4, C.
Ma, Chair of WG 1.4.2, S. Lambert, Chair of WG 1.4.3
The main directions of the WG 1.4.1 activity are the following:
1. Analysis of ICRS definition in view of the latest development in astrometry and space
geodesy.
2. Effect of 2000, 2003, and 2006 IAU resolutions related to Earth rotation on ICRS
definition and realization.
3. Effect of the latest changes in the IERS Conventions on ICRS definition and
realization.
4. Alignment of ICRF to ICRS.
5. Study of systematic errors in the current individual CRF and ICRF realizations.
6. Study of effects of geodetic datum definition on VLBI-determined CRF.
A part of the results outlined below and related to the construction of the next ICRF
realization, ICRF2, will be included in detail in the IERS Technical Note 35 which is due for
the IAU General Assembly 2009. This work is a result of joint activity with the dedicated
IAU and IERS/IVS Working Groups and the IERS ICRS Product Center.
1.
Analysis of the ICRS definition in view of the latest development in astrometry and
space geodesy
A detailed analysis of the ICRF definition in connection with other related issues, such as
ICRF, time scales, CIO, etc., was given by the IAU Division I Working Group “Nomenclature
for Fundamental Astronomy'' (NFA) in its Report to the IAU 2006 General Assembly. No
substantial progress has been achieved since that report. However, the ICRF definition becomes
not well understood and consistent when moving to the modern observations e.g. VLBI and
GAIA. To solve arisen problems a set of new considerations is needed on such issues as general
relativity and acceleration of the solar system barycentre.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
2.
Effect of 2000, 2003, and 2006 IAU resolutions related to Earth rotation on the ICRS
definition and realization
These issues are summarized in Capitaine (2007, 2008). Further analysis is planned.
3.
Effect of the latest changes in the IERS Conventions on ICRS definition and
realization
To be investigated.
4.
Alignment of ICRF to ICRS
A procedure for final aligning of the ICRF2 has been developed by the group at Paris
Observatory. This procedure mainly follows the procedure used in the 1990s for alignment of
the ICRF with some updates related to the source classification, selection of the core
(defining) sources, and inflation of formal errors. Special attention has been given to
maintenance of the stability of the ICRF2 axes, in particular through а choice of the optimal
set of core sources.
5.
Study of systematic errors in the current individual CRF and ICRF realizations
During the preparation and final phases of the ICRF2 construction, several IVS Analysis
Centers (AUS, BKG, GSF, IAA, MAO, OPA, SHA, USN) produced a large series of radio
source position catalogues using various data sets, software and analysis options. Comparison
of these catalogues allowed us to draw some conclusions on a level of the CRF systematic
differences depending on such factors as:
– Data set, e.g. using or omitting early observations, mobile occupations and some other
poor networks or VCS sessions (marginal effect),
– Software used (appreciable effect),
– Troposphere gradient modeling (largest effect),
– TRF vs. baseline solution (marginal/appreciable effect, needs further investigate on),
– Atmosphere pressure loading (no effect),
– Axis offset estimation (marginal/appreciable effect, depends on software),
– NMF vs. VMF1 mapping functions (marginal effect).
In the list above, "marginal effect" means systematic differences at a level below 15-20
microarcseconds, "appreciable effect" means systematic differences at a level up to about 100
microarcseconds.
Besides, the following studies were conducted:
– Investigation of systematic and individual (peculiar) source motion,
– Analysis of the consistency of CRF realizations at different frequency bands,
– Methods of assessment of absolute accuracy and systematic errors of CRF catalogues.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
6.
Study of effects of geodetic datum definition on VLBI-determined CRF
A relevant study performed by the VLBI group at IGG/Vienna has shown that the selection of
celestial datum points has no significant systematic impact on source coordinates.
7.
Impact of the ICRS and ICRF problems on geodesy
Although geodesy mainly deals with measurements on and of the Earth, it is closely
connected with and depends on measurements on the sky, at least in two aspects:
– Many geodetic measurements are made through observations of sky objects,
– Many applied and fundamental geodetic results are obtained from the common
adjustment of the TRF, EOP, and CRF parameters.
For this reason an impact of the adopted ICRF on geodetic results is anticipated, and the
consequences of moving from ICRF to ICRF2 should be investigated after completing and
publishing the ICRF2.
WG 1.4.2 Realization of Celestial Reference Frames (CRF and Transformations)
Chair: Chopo Ma
WG members: C. Ma (Chair), O. Titov, R. Heinkelmann, G. Wang, F. Arias, P. Charlot, A.M. Gontier, S. Lambert, J. Souchay, G. Engelhardt, A. Nothnagel, V. Tesmer, G. Bianco, S.
Kurdubov, Z. Malkin, E. Skurikhina, J. Sokolova, V. Zharov, S. Bolotin, D. Boboltz, A. Fey,
R. Gaume, C. Jacobs, L. Petrov, O. Sovers
1.
Goal of the Working Group
Produce ICRF2 for IERS / IVS consideration and for submission to the corresponding IAU
Working Group
2.
Charter and purpose
The purpose of Working Group 1.4.2 (which is identical with the corresponding IERS/IVS
Working Groups) is to generate the second realization of the ICRF from VLBI observations
of extragalactic radio sources, consistent with the current realization of the ITRF and EOP
data products. The Working Group (WG) will apply state-of-the-art astronomical and
geophysical models in the analysis of the entire relevant S/X astrometric and geodetic VLBI
data set. It will carefully consider the selection of defining sources and the mitigation of
source position variations to improve the stability of the ICRF. The goal is to present the
second ICRF to relevant authoritative bodies, e.g. IERS and IVS, and submit the revised
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
ICRF to the IAU Division I WG ‘On the second realization of the ICRF’ for adoption at the
2009 IAU General Assembly.
3.
Activities in the period 2007 to mid 2009
In the period 2007 to mid 2009 WG 1.4.2 undertook the analysis to generate the next
realization of the ICRF at microwave frequencies using VLBI data. The WG concentrated on
several main areas: time series of source positions to determine stable and unstable sources,
compilation of source structure snapshots and evolution to supplement the time series,
determining the effects of variations in modeling, data and analyst choices, generation of
source catalogues using the best available geophysical and astronomical models, and
orientation to the ICRS as realized by the current ICRF. The WG met a number of times:
April 2007 in Vienna, September 2007 in Paris, March 2008 in St. Petersburg, September
2008 in Dresden, December 2008 in Washington and March 2009 in Bordeaux. The work for
the catalogue to be proposed to the IAU is being compiled as IERS Technical Note No. 35.
WG 1.4.3 Interaction between Celestial and Terrestrial Reference Frames
Chair: Sébastien Lambert (since mid 2008)
WG members: Ch. Bizouard, H. Boomkamp, R. Heinkelmann, S. Lambert (Chair), F. Seitz,
P. Steigenberger, D. Svehla; C. Ma (Chair of WG 1.4.2), Z. Malkin (Chair of WG 1.4.1), H.
Schuh (Ex officio, Chair of IAG SC 1.4).
This report summarizes research activities in link to IAG WG 1.4.3 between mid 2008 and
mid 2009, i.e. since S. Lambert became Chair of the WG.
1.
Effects of CRF realization on EOP and TRF
1.1.
Influence of the CRF datum and analysis configuration
During a typical VLBI solution, station coordinates and velocities and radio source
coordinates are estimated as global parameters, while EOP are estimated as arc parameters.
The first version of the ICRF (Ma et al. 1998) proposed 212 sources to define the ICRS axes.
Since then, other subsets have been investigated. Feissel-Vernier et al. (2006), MacMillan and
Ma (2007), Titov (2007), Lambert et al. (2008), and Lambert and Gontier (2009) investigated
the effects of the selection of reference radio sources and of the analysis configuration in
geodetic products. In this context, analysis configuration deals with the split between global
and arc radio source coordinates (e.g., downgrading very unstable sources as arc parameters,
or keeping them as global but not using them in the no net rotation (NNR) condition). These
studies showed that the choice of the defining sources mainly influences the bias of the
nutation series. However, the analysis configuration can produce changes in estimates of
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
long-period nutation spectral components at the level of 10 microarcseconds. This does not
affect geophysical results like the Earth’s outer core resonant frequency in a significant way.
1.2.
Work w.r.t. the ICRF2
A number of IVS Analysis Centers are participating to the construction of the new realization
of the ICRS. The ICRF2 is now in its final stage and should be delivered by mid-2009 for the
IAU General Assembly. It will provide new coordinates for about 3800 sources, and a set of
defining sources to replace the 212 ICRF defining sources. This work has been done within
the IERS/IVS Working Group “Second Realization of the ICRF”, chaired by C. Ma which as
IAG WG 1.4.2 also reports to IAG. The consequences of using the ICRF2 in calculation of
other geodetic products will have to be treated after its complete release. Besides, a number of
scientific results including effects of the analysis configuration (station handling, models) in
CRF realization will be reported in the IERS Technical Note 35.
2.
Effects of the TRF realization on EOP and CRF
A study performed by Z. Malkin (2009) showed that the VLBI-derived EOP accuracy
primarily depends on the VLBI network geometry and to a lesser extent on other factors, such
as recording mode, data rate and scheduling parameters, whereas these factors have a stronger
impact on the EOP precision. The study proposes a ‘geometry index’ for VLBI networks
based on the network volume.
3.
Geophysical or technique modeling issues
3.1.
Atmosphere delay
Kouba (2009) and Steigenberger et al. (2009a) studied the impact of different mapping
functions (GMF and VMF1) and hydrostatic a priori zenith delays (GPT and ECMWF) on
GPS-derived station positions. Whereas Kouba (2009) used the Precise Point Positioning
(PPP) approach, Steigenberger et al. (2009a) used homogeneously reprocessed doubledifferenced global network solutions. The station height differences between terrestrial
reference frames computed from these reprocessed solutions with GMF/GPT and with
VMF1/ECMWF are in general below 1 mm. Both authors found, that the application of GPTderived a priori delays results in a partial compensation of atmosphere loading.
3.2
Antenna phase center variations
Steigenberger et al. (2009b) computed four TRF solutions with different GPS antenna phase
centre models from 11 years of reprocessed GPS observations. The station coordinate changes
due to different phase centre models can reach 5 mm for the horizontal and up to 16 mm for
the vertical component. The velocity changes are 1 mm/yr and 2.5 mm/yr, respectively.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Bibliography 2007–2009
Capitaine N., Andrei A.H., Calabretta M., Dehant V., Fukushima T., Guinot B.R., Hohenkerk C.Y., Kaplan
G.H., Klioner S.A., Kovalevsky J., Kumkova I.I., Ma C., McCarthy D.D., Seidelmann P.K., Wallace P.T.
Division I Working Group Nomenclature for fundamental astronomy. Transactions IAU, v. 3, Issue 26B, Ed. K.
van der Hucht, 74-78, 2007.
Capitaine N. Recent progress in concepts, nomenclature and models in fundamental astronomy. In: The Celestial
Reference Frame for the Future, Proc. Journées 2007, N. Capitaine (Ed.), 61-132, 2008.
Charlot P. Astrophysical Stability of Radio Sources and Implication for the Realization of the Next ICRF. In:
Measuring the Future, Proc. Fifth IVS General Meeting, A. Finkelstein, D. Behrend (Eds.), 345-354, 2008.
Feissel-Vernier, M., Ma, C., Gontier, A.-M., Barache, C. Analysis issues in the maintenance
of the ICRF axes, Astron. Astrophys., 452, 1107, 2006.
Gontier A.-M., Lambert S.B. 2008, Stable radio sources and reference frame, In: Proc. Journées 2007, N.
Capitaine (Ed.), 42–43, 2008.
Heinkelmann R., Bőhm J., Schuh H. Effects of Geodetic Datum Definition on the Celestial and Terrestrial
Reference Frames Determined by VLBI. In: J. Boehm, A. Pany, H. Schuh (Eds.), Proc. 18th European VLBI for
Geodesy and Astrometry Working Meeting, Vienna, Austria, 12-13 Apr 2007, 200-205, 2007.
Hering R., Walter H.G. On the Hipparcos Link to the ICRF Derived from VLA and MERLIN Radio Astrometry.
J. Geodesy, v. 81, 479–482, 2007.
IERS Technical Note 35, 2009, in preparation.
Jacobs C., Sovers O. Extending the ICRF above S/X-band: X/Ka-band Global Astrometric Results. In:
Measuring the Future, Proc. Fifth IVS General Meeting, A. Finkelstein, D. Behrend (Eds.), 284-288, 2008.
Klioner S.A. Relativity in fundamental astronomy: solved and unsolved problems. In: The Celestial Reference
Frame for the Future, Proc. Journées 2007, N. Capitaine (Ed.), 127-132, 2008.
Kouba, J. Testing of global pressure/temperature (GPT) model and global mapping function (GMF) in GPS
analyses, J. Geod., 83: 199-208, DOI 10.1007/s00190-008-0229-6, 2009.
Lambert S. B., Dehant V., Gontier A.-M. Celestial frame instability in VLBI analysis and its impact on
geophysics. Astron. Astrophys., v. 481, 535–542, 2008.
Lambert S.B., Gontier A.-M. On radio source selection to define a stable celestial frame. Astron. Astrophys., v.
493, 317-323, 2009.
Lambert S.B., Gontier A.-M. On radio source selection and frame stability, In: Proc. 19th European VLBI for
Geodesy and Astrometry Working Meeting, 2009. (in press)
Ma C., Gordon D., MacMillan D., Petrov L. Some Challenges in Developing the Second ICRF. In: Measuring
the Future, Proc. Fifth IVS General Meeting, A. Finkelstein, D. Behrend (Eds.), 251-255, 2008.
MacMillan D.S., Ma C. Radio source instability in VLBI analysis. J. Geodesy, v. 81, 443-453, 2007.
Malkin Z. On the accuracy assessment of celestial reference frame realizations. J. Geodesy, v. 82, 325-329,
2008.
Malkin Z. On Construction of ICRF-2. In: Measuring the Future, Proc. Fifth IVS General Meeting, A.
Finkelstein, D. Behrend (Eds.), 256-260, 2008.
Malkin, Z. On comparison of the Earth orientation parameters obtained from different VLBI networks and
observing programs, J. Geod., 83, 547, 2009
Sazhin M.V., Sementsov V.N., Zharov V.E., Kuimov K.V., Ashimbaeva N.T., Sazhina O.S. Cosmological and
kinematical criteria for the ICRF2 sources selection. arxiv:09042146v1, 2009.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Sokolova J., Malkin Z. On comparison and combination of catalogues of radio source positions. Astron.
Astrophys., v. 474, 665-670, 2007.
Steigenberger, P., Boehm, J., Tesmer, V. Comparison of GMF/GPT with VMF1/ECMWF and implications for
atmospheric loading, J. Geod., DOI: 10.1007/s00190-009-0311-8, 2009a.
Steigenberger, P., Rothacher, M., Rülke, A., Fritsche, M., Dietrich, R. Effects of different antenna phase center
models on GPS-derived reference frames, In: Drewes, H. Geodetic Reference Frames, IAG Symposia, Vol. 134,
Springer, 2009b.
Tesmer V. Effect of Various Analysis Options on VLBI-determined CRF". In: J. Boehm, A. Pany, H. Schuh
(Eds.), Proceedings of the 18th European VLBI for Geodesy and Astrometry Working Meeting, Vienna, Austria,
12-13 Apr 2007, 103–110, 2007.
Tesmer V., Bőhm J., Heinkelmann R., Schuh H. Effect of Different Tropospheric Mapping Functions on the
TRF, CRF and Position Time-series Estimated from VLBI". J. Geodesy, v. 81, 409–421, 2007.
Titov O. Effect of the selection of reference radio sources on geodetic estimates from VLBI observations. J.
Geodesy, v. 81, 455–468, 2007.
Titov O. Apparent Proper Motions of Radio Sources from Geodetic VLBI Data. Astronomy Letters, v. 33, 481487, 2007.
Titov O. Proper motion of reference radio sources, arXiv:0804.1403, 2008.
Titov O. Systematic effects in apparent proper motion of radio sources. In: Measuring the Future, Proc. Fifth IVS
General Meeting, A. Finkelstein, D. Behrend (Eds.), 265-269, 2008.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Inter-Commission Project 1.2: Vertical Reference Frames
Chair: Johannes Ihde (Germany)
1.
The ICP1.2 Vertical Reference Frames in the Period 2007 - 2011
The IAG Inter-Commission Project 1.2 studied during the period 2003 – 2007 the possibilities
of the definition and realization of a global vertical reference system (GVRS) based on the
classical and modern observations and a consistent modeling of both, geometric and
gravimetric parameters.
The results of the work of the Inter-commission Project 1.2 are documented in Conventions
for the Definition and Realization of a Conventional Vertical Reference System (CVRS).
In the CVRS conventions a general concept for the definition and realization of a unified,
global vertical reference system is described. The CVRS conventions are aligned to the IERS
2003 Conventions. Parts of the IERS 2003 conventions are the basis for the CVRS
conventions.
Open topics are concepts for the
– Establishment of an information system describing the various regional vertical
reference frames and their relation to a GVRS,
– Determination of transformation parameters between regional vertical reference
frames and the unified global height system as well as
– Relationship between a GVRS and the International Terrestrial Reference System.
Objectives in the period 2007 - 2011
– Considering the open topics of the period 2003 - 2007
– Further development of the CVRS conventions
– Preparation of decision about numerical standards as task in cooperation with
International Astronomical Union (IAU) and international hydrological associations.
– Initiation of a pilot project for an WHS realization
Program of Activities
– Study of information on regional vertical systems and their relations to a global
vertical reference system for practical applications;
– Study of combination procedures of height data sets from different techniques;
– Development of the basic relationships between ITRS and IVRS conventions,
parameters, realization, models
– Unification of regional (continental) height systems
– Preparation of a pilot project for the realization of a GVRS.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
2.
The Realization Concept
The realization of an IVRS is a typical item of the IAG project GGOS, mainly as a
combination of different products of IAG services. The general case for realization of a WHS
and unification of continental VRS is the combination of GNSS and if possible of
GNSS/levelling with a global gravity model (GGM); which is named as the geodetic
boundary value problem (GBVP) approach. This approach is the combination of different
components:
– A global permanent GNSS network of stations connected with levelling networks,
optionally supplemented by permanent (SG) and/or periodical (AG) gravity
observations at selected stations
– A global gravity model (GGM) with continental and regional densifications using the
remove restore technique.
As result of this approach we have available physical heights or geopotential numbers related
to a geoid/quasigeoid Tp RRT which is related to a conventional zero level of the potential of
the Earth gravity field W0C. W0C is a parameter of the mean Earth ellipsoid which shall used
for all realization procedures of the WHS.
The WHS can be realized for two classes of points with two different procedures:
– GNSS points: cP = W0C – WP and Wp = Up GPS + Tp RRT and
– points of levelling networks k: cP = cP k + W0C – W0k . By this, cP k will be transformed
from the regional level W0k to the conventional global level W0C. The Difference W0C
– W0k can be determined by GNSS/levelling in selected co-location points by W0C – Tp
– Up GPS – cP k.
A further approach which can be used for the unification of vertical reference frames bases on
the combination of tide gauge observations with a global sea surface topography model. It is
necessary that the tide gauge stations are linked to the regional levelling network.
In general the realization und unification is a combination of the different elements based on a
set of consistent conventional numerical standards. The accuracy of WHS realization depends
in the first order from the resolution of the gravity model. A service providing all relevant
information would be useful.
3.
WHS Pilot Project
The pilot project (WHS-PP) could start with a case study of combination of available
elements:
(1) The global gravity model EGM07 with continental and national densifications
(2) For GNSS the IGS TIGA-PP, which monitors vertical movements of globally
distributed tide gauge stations
(3) Continental and national levelling networks linked to IGS TIGA stations
(4) The tide gauge stations observations linked to IGS TIGA stations which are a product
of the PSMSL
(5) Absolute and super conducting gravity meter measurement at selected IGS TIGA
stations
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
(6) A global sea surface topography model
(7) The numerical standards of IERS conventions 2003
Partners for the WHS-PP are inside the IAG the IGFS for GGM, absolute and super
conducting gravity meter measurements, IGS for TIGA, SC2.4 for continental and regional
desification of a GGM and GLOSS for PSMSL and a global sea surface topography model.
4.
Proposed continuation
The IAG has to clarify inconsistencies in the numerical parameters for integrated geodetic
applications. Conventions for the definition and realization of the parameters of the MSSL
have also to be agreed.
Proposed items for continuation:
− Discussion of the results of ICP1.2 (GGOS action)
− Initiation of a pilot project for an IVRS realization on the basis of the IGS TIGA-PP,
GGP and IGFS for AG and a CGGM (call for participation as an IGFS action)
− Further development of the CVRS conventions
− Decision about numerical standards as task of GGOS in cooperation with International
Astronomical Union (IAU) and international hydrological and oceanographic
organisations.
The project continuation shall be realized in cooperation with other organizations, especially
the International Association of Hydrological Sciences (IAHS), the International Association
for the Physical Sciences of the Oceans (IAPSO), Global Sea Level Observing System
(GLOSS) the International Hydrographic Organisation (IHO), the International Federation of
Surveyors (FIG), and the Inter-service Geospatial Working Group (IGeoWG) of NATO.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Inter-Commission Working Group 1.1: Environment Loading:
Modelling for Reference Frame and Positioning Applications
Chair: Tonie van Dam (Luxembourg) , Jim Ray (USA)
Introduction
The accuracy and precision of current space geodetic techniques are such that displacements
due to non-tidal surface mass loading are now measurable in many cases. Consequently, data
analysts have an increasing interest in comparing geodetic and computed load displacements,
or even in applying displacement corrections to geodetic results to remove the geophysical
loading effects. Unfortunately, direct correction of geodetic estimates by computed load
displacements can introduce undesirable errors into coordinate times series and thus into the
ITRF itself if the corrections are not computed or applied with utmost care. Problems that are
sometimes encountered include: a proliferation of different (and sometimes erroneous)
loading models; lack of accurate load models for some effects; use of various different
reference frames not always well suited to the geodetic reductions; applying corrections at the
observation level versus longer-period a-posteriori average corrections; undesirable attributes
of some geophysical loading models such as a lack of mass conservation or other errors. The
main activity of this working group is to investigate procedures to ensure that suitable
environmental corrections are available to users and that the optimal usage is made.
Objectives
The principal objective of the scientific work of Working Group 1.1 is to investigate optimal
methods to mitigate loading effects in ITRF frame parameters and site coordinates. Additional
goals include basic research into the determination of accurate load displacements for the
various component geophysical fluids, accuracy assessment for different loading models,
assessment of the propagation of errors into the site coordinates and the ITRF, and
specifications of which model displacements are best applied at the geodetic observation level
and which are better applied in post-processing. Results of these investigations should be
integrated into the recommendations of the IERS Conventions, where appropriate.
Members
Tonie van Dam (Luxembourg, chair)
Jim Ray (USA, co-chair)
Zuheir Altamimi (France)
Xavier Collilieux (France)
Pascal Gegout (France)
David Lavallee (UK)
Ernst Schrama (Netherlands)
Xiaoping Wu (USA)
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
General Activities and Recommendations
The main activities of the members of this working group are represented in papers published
(see reference list) or in preparation, as well as oral and poster presentations at the Fall
Meetings of the American Geophysical Union (San Francisco, CA, USA), General
Assemblies of the European Geosciences Union (Vienna, Austria), and occasional other
special and topical meetings.
Based on our research findings, it is our specific recommendation that displacements due to
non-tidal geophysical loadings not be included in the a priori modeled station positions. The
most serious obstacles to including loading displacements as a priori corrections presently are:
reliability in the sub-daily band -- At best, non-tidal environmental models attempt to
compensate mostly for seasonal variations, which are well outside the normal integration
intervals for space geodetic data. None of the available global circulation models properly
accounts for dynamic barometric pressure compensation by the oceans at periods less than
about two weeks. Instead, both "inverted barometer" (IB) and non-IB implementations are
produced as crude approximations of the actual Earth system behavior even though these are
both recognized as unreliable in the high-frequency regime. While effective at longer periods
(especially seasonal), the undesirable and unknown degradation that would affect sub-daily
integrations (not only for geodetic parameters, but also for any other parameters estimated
from the observations) is not an acceptable side-effect. This is particularly compelling when
one considers that non-tidal loading effects can be readily considered in a posteriori studies
with no loss whatsoever.
inaccuracies of the models -- The basic types of studies and analyses that are normally
considered a precondition to adoption of a conventional model are mostly lacking for nontidal models. Documentation of error analyses is a basic requirement that must be fulfilled. In
their statistical comparison of several publicly available atmospheric pressure loading
services, van Dam and Mendes Cerveira (2007) have identified differences up to several mm
(RMS) due to effects of varying model parameters and input data choices. This study does not
account for possible common-mode error sources. Before general users can be expected to
routinely utilize non-tidal loading services sensibly, it is vital that the major sources of
systematic differences identified in such studies be resolved. Studies of other loading effects
are also mandatory. The approach considered by Koot et al. (2006) in their study of various
models for atmospheric angular momentum (AAM) is a good example of how a combined
series might be formed to reduce series-specific noise. This type of development should be
considered in the provision of all non-tidal loading results, partly as a convenience to users as
well as a potentially improved product.
must be free of tidal effects -- Any non-tidal displacement corrections applied should be
strictly free of residual tidal contaminations, otherwise the geodetic results will be adversely
affected by aliasing and possible duplication of the directly modeled tidal signals. This is not
always assured in operational loading services currently available.
long-term biases in the reference frame -- Because environmental models do not yet conserve
overall mass or properly account for exchange of fluids between states, use of non-tidal
models in solutions for the terrestrial reference frame will generally suffer from long-term
drifts and biases that are entirely artificial. This is a completely unacceptable circumstance.
new datum requirements for the reference frame – Introducing pressure-dependent non-tidal
site displacement contributions into standard geodetic solutions would necessitate the
adoption of a global reference atmospheric pressure field. The ITRF reference coordinates
(mainly height) for any given site would depend directly on the associated reference pressure
for that site. In order to minimize deviations from the established frame, one would probably
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
prefer that the reference pressures closely match long-term average pressure values at every
possible geodetic site. But the lack of long-term in situ met data from many locations could
make such a goal unreachable. Furthermore, many ITRF users would probably not welcome
nor understand the expansion of the ITRF datum to include such non-geodetic quantities as
reference pressures. In certain other non-tidal loading cases, it might also be necessary to
consider additional non-geodetic quantities as reference datum contributors (such as local
mean temperatures). If non-tidal displacements are not allowed, then there is no ITRF
requirement to adopt a conventional reference pressure field, though this might still be
considered and might be useful for other reasons. Note that it is important to continue
development of improved, unbiased methods to derive local a priori pressure values globally
in order to properly model tropospheric delay effects optimally, which in turn is necessary for
accurate station height estimates.
need to easily test alternative models -- As noted above, it is vital to be able to compare
different non-tidal models easily and efficiently, something that is not facilitated by direct
inclusion of the models a priori into geodetic analyses. It is far simpler to make such
comparisons and studies a posteriori as has been done for many years in research into the
excitation of Earth orientation variations. However, in solutions where non-tidal
displacements have nonetheless been applied, it is imperative that the full field of corrections
used must be reported in new SINEX blocks that will need to be documented. The availability
of such information will permit only an approximate removal of the non-tidal corrections,
though, if the applied sampling is finer than the geodetic integration interval.
We recommend that models of non-tidal station displacements be made available to the user
community through the IERS Global Geophysical Fluid Center and its special bureau,
together with all necessary supporting information, implementation documentation, and software. Expansion of the IERS Conventions, Chapter 7, could include some essential aspects of
this material to inform users. Continued research efforts are strongly encouraged, particularly
to address the outstanding issues listed above. However, in the meantime non-tidal
displacements must not be included in operational data reductions that are contributed to the
IERS to support its products and services.
Notwithstanding the preceding remarks concerning a priori load displacement corrections, we
believe that further research is warranted into the possible utility of including non-tidal
loading displacements in the formation of ITRF, a posteriori to the reduction of the space
geodetic data. It is currently assumed implicitly in the ITRF procedures that varying site
deformations, such as those due to loading, average out in the long-term stacking of time
series of coordinate frames from each technique. If the loading models have a SNR greater
than 1, at least at seasonal periods, then the averaging should be more effective if the load
corrections are applied during the stacking. Furthermore, any effects of sparse networks and
non-continuous observing ("network effects") should also be reduced. This is likely to be
more important for the weaker SLR and VLBI networks than for GPS and DORIS.
Such an approach could be implemented in the first step of the ITRF combination process,
where the individual technique coordinate frame time series are stacked. Each of the load
contributions would need to be integrated over the same time intervals as the frame
increments. The result would be a long-term frame for each technique consisting of the usual
reference positions and velocities. Time series of station residuals could be generated in two
ways, with and without the a posteriori load corrections and the characteristics of each
compared and assessed. The time series of the Helmert parameters would be nominally free of
loading effects. This is likely to be most significant for those parameters dominated by the
SLR or VLBI contributions, such as the overall ITRF scale variations and geocentre motions
(the Helmert translations from SLR). The EOP time series would also be free of loading
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
contaminations and less affected by network effects, but this is unlikely to be significant for
those components dominated by GPS observations.
In the second step of ITRF formation, to combine the technique long-term frames, no further
loading corrections are needed. Before such a procedure as this could be considered for
operational use, careful studies would be required. Among other things, the issues raised
above must be carefully evaluated, particularly the possibility of long-term biases in the
loading models that could adversely affect the stability of ITRF. If this is a problem, the
loading fields could be detrended for secular variations before being used in the ITRF
stackings, for instance. Consideration would also be needed of the consequences for user
applications, particularly for the EOPs.
Use of non-tidal loading models in this a posteriori way would affect only globally integrated
estimates (Helmert parameters, EOPs, and ITRF itself). The potentially degrading effects
discussed before of applying the models a priori at the observation level would be avoided.
The inter-station vectors of individual technique coordinate frames, for example, would not be
affected by high-frequency noise from the load models and simultaneously estimated nongeodetic parameters would be similarly unaffected.
References
Collilieux, X., Z. Altamimi, D. Coulot, T. van Dam, J. Ray: Impact of loading effects on the terrestrial reference
frame determination. Advances in Space Research, submitted 2009.
Collilieux, X., Z. Altamimi, J. Ray, T. van Dam, X. Wu: Effect of the satellite laser ranging network distribution
on geocentre motion estimation. J. Geophys. Res. – Solid Earth, 114(B4), B04402, doi: 10.1029/2008JB005727,
2009.
Koot, L., O. de Viron, V. Dehant: Atmospheric angular momentum time-series: Characterization of their
internal noise and creation of a combined series. J. Geod, 79, 663-674, doi: 10.1007/s00190-005-0019-3, 2006.
Ray, J., Z. Altamimi, T. van Dam, T. Herring: Principles for conventional contributions to modelled station
displacements. Position paper for IERS Workshop on Conventions, September 2007, held at Bureau International des Poids et Mesures, http:www.bipm.org/utils/en/events/iers/Conv_PP1.txt, 2007.
van Dam, T.M., P.J. Mendes Cerveira: Statistical comparison of publicly available atmospheric loading
corrections. Proceedings of the IERS Workshop on Combination, GeoForschungsZentrum, Potsdam, Germany,
10-11 October 2005, see also presentation at http://www.iers.org/documents/workshop2005/presentations/
Session-4_van_Dam.pdf, 2007.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Inter-Commission Working Group 1.2:
Precise Orbit Determination and Reference Frame Definition
Chair: Frank Lemoine (USA)
The members of the working group have agreed to focus on the effects of non-conservative
force model error in precision orbit determination and how it aliases into POD solutions. In
addition, we discuss in this report the work accomplished by members of the DORIS
community with respect to radiation pressure modelling, the development and testing of
improved radiation pressure models for Jason-1 and ENVISAT. Finally we report how we
have successfully mitigated the effects of atmospheric drag on DORIS POD and
determination of reference frame parameters. We note the work underway in the community
to developed improved atmospheric drag models for satellite applications.
Historically the DORIS recoveries for geocentre have been characterized by reasonable
recoveries in X and Y, but large signals in Z. For example Feissel-Vernier et al. (2006) for
three sample series find annual signals of ± 5 mm in X and Y but ± 20 mm in Z. In the
DORIS geocentre time series, the prime signals occur at the annual period, but also at the
solar beta prime (draconitic) period for TOPEX/Poseidon. This was the key clue that
indicated mis-modelling of radiation pressure was aliasing into geocentre recovery for
DORIS. Gobinddass et al. (2009) showed that by tuning the solar radiation pressure
reflectance coefficient (Cr) for each satellite (in effect scaling the macro-model), and fixing it
in the orbit solutions, it was possible to mitigate the radiation pressure mis-modelling and
recover a cleaner geocentre signal, particularly in the Z component. The problem is
particularly acute for DORIS as many members of the satellite constellation are sunsynchronous, and so the radiation pressure mis-modelling will alias directly into an annual
signal. In the new IGN solutions, the Z component in geocentre is more in line with the
expected annual amplitude predicted by geophysical models. We are pleased to report that the
time series of Gobinddass et al. (2009) has been incorporated into the IDS combination,
however not all the DORIS analysis centres have completed the same level of radiation
pressure model tuning. A spectral analysis was completed of the geocentre signals of all the
IDS AC’s, and strong Z amplitudes at the annual period (365 days) and TOPEX draconitic
period (120 days) were present in several of the series. In future work, all the AC’s will be
encouraged to upgrade their models and data processing.
Drag modelling and parameterization of drag coefficients are also a key issue for DORIS
satellite POD, particularly in solar storms and other overall periods of high solar activity
(Willis et al., 2005). The drag mis-modelling effects can be mitigated by increasing the drag
parameterization (i.e. adjusting an empirical drag coefficient more frequently for the low
altitude satellites such as the SPOT’s and ENVISAT). The habit had been to adjust such cd’s
every four to six hrs, however more frequent adjustments improve the station repeatability
and EOP recovery during high drag periods (Gobinddass and Willis, 2008). Of the DORIS
analysis centres, for the IDS-1 Combination prepared for ITRF2008, only IGN and ESA
parameterized drag at the higher levels (1-2.4 hrs) (Valette and Yaya, 2009). As a
consequence, when the WRMS (weekly RMS repeatability w.r.t. a cumulative position
velocity solution) was computed, a spike was observed in late 2001 to 2002. This was found
to coincide nearly exactly with the increase in solar flux around the peak of the solar cycle,
and the increase in the RMS of fit in the DORIS satellite arcs (Yaya and Valette, 2009). Thus,
the analysis centres were asked to reprocess their data from the Autumn of 2001 to the Spring
of 2002 with a higher drag parameterization. The GAU, GSC and LCA analysis centres
complied with this recommendation, and the result is that in IDS-2 ITRF2008 test
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
combination, the peak in the WRMS around the peak of the solar maximum has been much
reduced from 26 mm with IDS-1 to 20 mm in IDS-2. We note that the GOP analysis centre is
probably not as affected by atmospheric drag as they use the Bernese software and solve for
frequent stochastic parameters as a routine part of their OD solutions (Stepanek et al., 2006).
The more frequent cd adjustment (in the ESA, IGN, GSC, GAU and LCA satellite orbits) is
made possible by applying a weak constraint on the estimated cd’s and/or a time-correlation
with exponential decay time constant and a process noise sigma between adjacent cd
parameters.
We note that work is underway in the community to upgrade atmosphere models. These
include the group at the GRGS/CNES who are analyzing accelerometer data from GRACE
and CHAMP for inclusion into new atmosphere models (cf. Bruinsma and Forbes, 2007;
2008). In addition teams led by US. Naval Research Lab has developed improved drag
models built upon the long history of MSIS models (Picone et al., 2002). The NRL is leading
an experiment with the ANDE satellite, to study the Earth’s thermosphere and gather further
data to improve drag models (ILRS/ANDE, 2009; Thomas, 2008). The model developed by
Bowman et al. (2008) is particularly interesting, as it relies on solar indices that track more
closely how the Sun deposits energy into the thermosphere of the Earth. These indices are in
the Far Ultraviolet and Extreme Ultraviolet, as opposed to the standard F10.7 proxy that has
been used for years. The development of these models is very encouraging, however in any
given orbit determination software it is easier to adjust new parameters than integrate a new
orbit determination model, which requires manpower, testing and possibly adherence to
standards of configuration control.
Figure 1: Density comparisons from 2002 to 2009 from atmosphere density models and from GRACE.
Atmosphere density estimates based on GRACE accelerometer data have been used to
validate various density models, including the 1978 Density Temperature Model (DTM78),
the Air Force Space Command’s High Accuracy Satellite Density Model (HASDM) and the
Jacchia-Bowman 2006 (JB2006) model (Cheng et al., 2007, 2008; Tapley et al., 2007). Figure
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
1 shows that the models tend to under-predict the density when solar activity is high (except
for DTM78 over some periods) but agree better (especially for HASDM) with GRACE
densities during low solar activity (starting from early 2006). The earlier empirical DTM78
model appears to over-predict the density as compared to the GRACE measurements after
2006 where the solar activity was decreasing. The extreme density values in during 2003 are
due to the high solar activity and geomagnetic super-storm that occurred during the period of
October-November 2003.
We also note that while at present the issue of drag modelling and parameterization affects
primarily the IDS contribution to the reference frame, atmospheric drag is a strong signal on
the Starlette and Stella satellites. These SLR cannonball targets are not typically used for
reference frame work although some preliminary work has been done in this regard (Govind
et al., 2007). The addition of further satellites, in particular targets with a tight SLR target
signature (cf. see Otsubo and Appleby, 2003 for a discussion of this issue) could benefit the
SLR solutions. In particular prior to 1993, the addition of Starlette would strengthen the SLR
reference solutions when Lageos was the only contributor. However many issues other than
proper drag modelling and parameterization need to be resolved before these new satellites
can be added to SLR reference frame solutions.
In this report period, working group members have tested improved radiation pressure models
developed at the University College London (UCL) for the Jason-1 and ENVISAT satellites
(Ziebart et al., 2005; Sibthorpe, 2006). ENVISAT is one of the members of the DORIS
satellite constellation. Jason-1 does not presently contribute to the DORIS reference frame
solutions as the data are omitted due to the instability of the DORIS Ultra-stable Oscillator
and its radiation sensitivity (Willis et al., 2004). However, development of an improved
radiation pressure model is important first of all for oceanographic and mean sea level
applications, as analysis of the CNES/GDR-C orbits has revealed a draconitic signature (betaprime, or Sun-related) in the altimeter data (Leuilette et al., 2009). The UCL models were
tested at NASA GSFC. For Jason-1, they find a systematic improvement in the SLR residuals,
and a reduction in the magnitude of the empirical accelerations (Lemoine et al., 2009). The
NASA GSFC std0905 orbits to be released to the Jason-1/Jason-2 Science team will use this
modelling (Lemoine et al., 2009). Although Jason-1 is not part of DORIS reference frame
solutions at present there is always the possibility the USO DORIS problem may be mitigated
in the future by more detailed modelling (eg. Lemoine JM and H. Capdeville, 2006). In
addition the Jason-1 spacecraft carries an SLR retro-reflector and GPS receivers. While the
prime and backup GPS receivers each in turn have failed, the long time span of SLR and GPS
data available mean that Jason-1 could make an interesting satellite with which to attempt
joint GPS/SLR reference frame solutions, should some group wish to make those experiments
in the future. A prerequisite would be minimizing the errors due to the non-sconservative
forces, including radiation pressure and in this context, the UCL radiation pressure model for
Jason-1 would be particularly useful.
The NASA GSFC team also tested the application of the UCL model on ENVISAT. It was
found that the amplitude of the daily empirical accelerations showed a notable improvement
(a factor of two to five). Doornbos et al. (2002), who applied a proprietary model, ANGARA,
to orbit determination for ENVISAT, found that during periods of intense solar activity,
deficiencies in the drag model, in particular the atmosphere response function to high flux or
geomagnetic indices was the dominant source of error. We note that Le Bail et al. (2009) saw
in 2003 a 27 day, solar-rotation-related, periodicity in the recovered ENVISAT along-track
empirical acceleration amplitudes. At low solar flux conditions, the drag and radiation
pressure model errors were found to be at a comparable level. In the future it would be
interesting to inter-compare the recovered 1opr accelerations from the different analysis
centres that analyze ENVISAT data, as well as the computed drag and radiation pressure
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
perturbations, in order to see what each orbit determination software is actually doing. The
UCL model for ENVISAT has also been implemented in the GIPSY/OASIS software at JPL,
and we expect that further tests with the IGN and/or INA DORIS analysis centres will be
possible in the near future.
Advances in GPS orbit modelling have also been accomplished by members of our working
group. An issue that has been present in GPS analyses is a putative bias in the SLR residuals
to GPS satellites. In addition Urschl et al. (2007) found that the range residuals derived from
the various GNSS orbits show similar periodic variations, which are correlated with eclipsing
seasons and the sun’s elevation above the orbital plane, indicating orbit or attitude modelling
deficiencies. Ziebart et al. (2008) have made progress in this area. They observe that the bias
can reach 4-5 cm around an arc on the dark side of the Earth (affecting primarily the satellites
that experience eclipse). They find that modelling planetary radiation pressure can reduce this
bias and that modelling antenna thrust further reduces the SLR residuals. The UCL team have
experimented with different parameterizations of the albedo, and with detailed radiation
pressure models for the GPS satellites (eg for the Block 2A and the Block 2R series of GPS
satellites). These model developments are promising and offer the prospect of improving the
GPS processing potentially for the next ITRF. Another avenue of radiation model improvement for the GPS satellites is suggested by Herring (2009). In his EGU paper, he showed the
radiation signature in the GPS orbits, and demonstrated the correlation with the empirical
terms used in orbit adjustment. As in Gobinddass et al. (2009) for the DORIS satellite orbits,
he showed how the effect could be mitigated by a proper tuning of the parameterization.
Taken together, these model and analysis developments are promising and offer the prospect
of improving the GPS processing potentially for the next ITRF (i.e. ITRF2011 or ITRF2012).
However, further testing is required and the working group will need to enlist the involvement
of GPS analysis centres to carry out detailed tests (meaning processing a long time series of
orbits and analyzing the daily station time series).
In the coming year, the working group will continue to focus on surface force model
improvement for the ENVISAT and SPOT satellites, and we will also address modelling for
Jason-2 (in orbit since June 2008) and Cryosat (scheduled for launch in late 2009) which will
likely become strong contributors to the IDS reference frame in the future. Both satellites
carry the DGXX DORIS receiver which can track up to seven DORIS beacons. Thus the
quantity of DORIS data available will drastically increase in coming years.
Another possible activity would be to ascertain how we might improve the orbits of LEO
satellites during periods of high solar activity through better forward modelling. If time and
resources permit, we will evaluate the JB2006 atmosphere density model, and another
atmosphere model upgrades that might be available.
We note that we have not addressed so far how the GPS reference frame might be affected by
non-conservative force mis-modelling. A draconitic signature is evident in the GPS orbits,
and is imputed to be due mis-modelling of the non-conservative forces.
We envisage a special session at the EGU General Assembly Meeting 2010 as a means to
focus community attention on the precision determination and reference frame issues.
References
Bowman, B.R., Tobiska, W.K., Marcos, F.A., and C. Valladares, The JB2006 empirical thermospheric density
model, J. Atmos. And Solar-Terrestrial Physics, 70(5), pp. 774-793, 2008.
Bruinsma S. and J.M. Forbes, Storm-time equatorial density enhancements observed by CHAMP and GRACE,
J. of Spacecraft and Rockets, 44(6), pp. 1154-1159, 2007.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Bruinsma S. and J.M. Forbes, Medium- to large-scale density variability as observed by CHAMP , Space
Weather-The International Journal of Research and Applications, 6(8), S08002, 2008
Cheng M. K., Ries, J., and B. D. Tapley, Assessment of the solar radiation model for GRACE orbit
determination, Paper AAS 07-283, AAS/AIAA Astrodynamics Specialist Conference, Mackinac Island,
Michigan, 19-23 August 2007.
Cheng M. K., Tapley, B.D., Bettadpur, S., and J. Ries, Thermospheric density from analysis of 6-year GRACE
Accelerometer data, AIAA Paper 2008-6949, AIAA/AAS Astrodynamics Specialist Conference, Hawaii, 18-21
August 2008.
Doornbos, E., Scharroo, R., Klinkrad, et al., Improved modelling of surface forces in the orbit determination of
ERS and ENVISAT, Can. J. Remote Sensing, Vol. 28, No. 4, pp. 535–543, 2002.
Feissel-Vernier, M., Le Bail, K., Berio, P., et al., Geocentre motion measured with DORIS and SLR, and
predicted by geophysical models, J Geod., 80, pp. 637–648
DOI 10.1007/s00190-006-0079-z, 2006.
Gobinddass, M.L. and P. Willis, Estimating DORIS drag coefficients: toward an optimum IDS analysis strategy,
International
DORIS
Service
Workshop,
Nice,
France,
12-14,
Nov.
2009.
URL:
http://ids.cls.fr/html/report/ids_workshop_2008/
Gobinddass, M.L., Willis, P., de Viron, O., et al., Systematic biases in DORIS-derived geocentre time series
related to solar radiation pressure mis-modelling, J. Geod., 83(8), DOI: 10.1007/s00190-009-0303-8, 2009.
Govind, R., Lemoine, F. Altamimi, A., Le Bail, K. and D Chinn, The contribution of Starlette/Stella SLR to
Terrestrial Reference Frame definition, Eos Trans. AGU, 88(52), Fall Meet. Suppl., Abstract G42A-02, 2007.
Herring, T.A., Orbit and phase centre model effects on GPS reference frame realizations, European Geosciences
Union General Assembly 2009, Vienna, Austria, Paper EGU2009-5198, April 20, 2009.
International Laser Ranging Service (ILRS), ANDE Satellite Information, URL: http://ilrs.gsfc.nasa.gov/
satellite_missions/list_of_satellites/andp_general.html ,July 2009.
Lemoine, J.M., and H. Capdeville, A corrective model for Jason-1 DORIS Doppler data in relation to the South
Atlantic Anomaly, J. Geod., 80(8-11), 507-523, 2006.
Lemoine, F.G., Zelensky N.P., Chinn D.S., et al., Towards Development of a Consistent Orbit Series for
TOPEX/Poseidon, Jason-1, and Jason-2, Adv. Space Res, Manuscript in preparation, July 2009.
Leuliette, E.W., 2009 Ocean Surface Topography Science Team (OSTST) Meeting, Seattle, Washington, USA,
June 22-24, 2009.
Otsubo, T., and G.M. Appleby, System-dependent centre-of-mass correction for spherical geodetic satellites, J.
of Geophys. Res. (Solid Earth) 108(9-1), 2003.
Picone, J.M., Hedin, A.E., Drob D.P. and A.C. Aikin, NRLMSISE-00 empirical model of the atmosphere:
Statistical comparisons and scientific issues, J. Geophys. Res., 107(A12), 1468, 2002.
Sibthorpe, A., Precision non-conservative force modelling for low Earth orbiting spacecraft, Ph.D. Thesis, Univ.
College London, London, U.K, 2006.
Stepanek, P., Hugentobler U., and K. Le Bail, First results of DORIS data analysis at Geodetic Observatory
Pecný, J. Geodesy, 80, pp. 657–664, DOI 10.1007/s00190-006-0071-7, 2006.
Tapley, B. D., J. Ries, S. Bettadpur and M. K. Cheng, Neutral density measurements from GRACE
accelerometers, AIAA J. Spacecraft and Rockets, 44(6), pp. 12220-1225, 2007.
Thomas, L., ANDE Concept, 16th International Workshop on Laser Ranging, Poznan, Poland, 2008.
Urschl, C., Beutler, G., Gurtner, W., Hugentobler, U., and S. Schaer, Contribution of SLR tracking data to GNSS
orbit determination, Adv. in Space Res., 39, pp. 1515–1523, doi:10.1016/j.asr.2007.01.038, 2007.
Valette, J.J. and P. Yaya, Presentation of IDS Combination: Processing & Results, DORIS Analysis Working
Group meeting (AWG) of the International DORIS Service, Mar. 23-24, 2009,
URL: http://ids.cls.fr/html/report/meetings/AWG200903.html
Willis, P., Haines, B., Berthias, J.P., et al., Behaviour of the DORIS/Jason oscillator over the South Atlantic
Anomaly, C.R. Geocsi., 336(9), 839-846, 2004.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Willis, P., Deleflie, F., Barlier, F., et al., Effects of thermosphere total density perturbations on LEO orbits
during severe geomagnetic conditions (Oct-Nov 2003) using DORIS and SLR data, Adv. Space Res., 36(3), pp.
522-533, 2005.
Yaya, P. and J.J. Valette, Validation of IDS Combination at Collocation Sites & Other Analyses, DORIS
Analysis Working Group meeting (AWG) of the International DORIS Service, Mar. 23-24, 2009, URL:
http://ids.cls.fr/html/report/meetings/AWG200903.html
Ziebart, M., S. Adhya, and A. Sibthorpe, Combined radiation pressure and thermal modelling of complex
satellites: Algorithms and on-orbit tests, Adv. in Space Res., 36(3), pp. 424-430, 2005.
Ziebart, M., Sibthorpe, A., Flohrer, C., Springer, T., and Y. Bar-Sever, Refinements in GNSS orbit modelling,
IGS Analysis Workshop, Miami, Florida, June 2008. URL: http://www.ngs.noaa.gov/IGSWorkshop2008/
prog.html
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Inter-Commission Working Group 1.3:
Concepts and Terminology related to Geodetic Reference Systems
Chair: Claude Boucher (France)
Recommended nomenclature related to Geodetic Reference Systems
V06 feb 2009
Introduction
The recommended nomenclature is composed of a set of selected terms, associated with
definitions, as listed in the lexicon given below in alphabetical order. In this introduction, we
present in a narrative format all selected terms, as well as other terms currently used, but not
or no more recommended. Recommended terms are written in bold .
The concept of Geodetic Reference System (GRS) is used here to designate any reference
system of metrological quality specific to Geodesy. It must be distinguished from the specific
use of this term traditionally adopted by the IAG and consisting of four fundamental constants
(such as GRS80) and the derived models (ellipsoid, normal gravity…). Nevertheless, we do
not consider it as part of the formal nomenclature, but as a background concept, in which we
must adopt a common understanding of the term “reference system”.
The general understanding of a reference system adopted here is the set of data necessary to
unambiguously determine numerical quantities, in addition to measurable quantities. In other
words, one can estimate unambiguously some quantities of interest, such as the coordinates of
points, by a combined use of relevant measurements and the choice of a GRS. Several aspects
can be considered related to a GRS:
– At the “ideal” level, a GRS is identified with objects of some physical model, such as
a local coordinate system of the relativistic space-time, or an affine frame of
Newtonian physics.
–
The unique identification of a given GRS requires a set of rules, numerical constants
and algorithms, designated as a Conventional GRS.
– At the so-called realization level, or the translation from the physical model to the
estimation model, the GRS follows two main approaches:
a) The application of a Conventional GRS, which permits a unique estimation of the
relevant quantities. In other words, they are the necessary and sufficient data and
rules which enable a proper estimation of parameters from measurements.
b) A conventional selection of quantities estimated according to those rules.
The primary example of a GRS is the Terrestrial Reference System (TRS) understood as a
spatial reference frame co-moving with the Earth in space.
The physico-mathematical model of a TRS is the spatial part of a system of Earth-linked
space-time coordinates within the framework of General Relativity, or alternatively an affine
Euclidian reference frame in the framework of Newtonian Physics. The general purpose of
such a system is to define coordinate systems in which points of the Earth are only slowly
changing, and to describe the motion of any object of the Earth’s environment (such as an
artificial satellite). If needed, one can be more specific by using the expression “ideal TRS”.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
The conventional rules to identify a TRS or its realizations were traditionally designated by
the expression Conventional Terrestrial Reference System (CTRS). We no longer recommend
the use of this expression, which is not clear enough for a wide community.
The main characteristics of a TRS are its origin, orientation and scale. These can be
considered either at the physical level, or at the estimation level.
At the physical level, for a given TRS:
•
The origin is modeled by the event (t,0,0,0) of the local coordinate system in
relativistic physics, or by the origin point of the affine frame in Newtonian physics.
•
The orientation can be represented by the unit vectors tangent to the spatial coordinate
axes in relativistic physics, or by the ortho-normal basis of the affine frame in
Newtonian physics.
•
The scale is related to the way the metrology of lengths is handled. It is a choice not to
allow any scalar factor with regard to the SI unit of length, or to allow a choice of unit
of length depending on the TRS.
At the estimation level, we introduce the concept of Terrestrial Reference Frame (TRF) as a
realization of a TRS, clearly identifying the origin, orientation and scale..
Usually, such a realization is done by a set of identifiers of physical points (geodetic markers,
tracking instrument reference points, center of mass of artificial satellites…) with
corresponding numerical coordinate information (values, derivatives, tabulation…) expressed
in a selected coordinate system linked to a specific TRS. Such a set was designated by the
expression Conventional Terrestrial Reference Frame (CTRF), which is no longer
recommended either. TRF is the unique preferred term to designate the realization of a TRS.
Two major types of TRS are currently used in Geodesy:
•
the local TRS well designed to map a small area of the topographic surface, as used by
laboratory experiments or topographers
•
the geocentric TRS, designed to map the whole Earth as well as its motion in space
For a local TRS, the origin is located on or near the topographic surface and the orientation is
local (horizontal and vertical).
For a geocentric TRS, the origin is at or near the geocentre and the orientation is equatorial. If
needed, one can distinguish between truly geocentric (see after) and quasi-geocentric, for the
TRS underlying classical terrestrial networks using fundamental points and for which the
origin may be displaced from the actual geocentre by several hundred meters.
For the astro-geodetic community, the Geocentric Terrestrial Reference System (GTRS) is
the fundamental strictly geocentric Terrestrial Coordinate System, now formally recognized
by the IAU and the IUGG.
The spatial part (3d) of the 4d GTRS is therefore a geocentric TRS.
Since 1988 a specific geocentric TRS has been selected and progressively formally adopted
by the international scientific community, and beyond. It is the International Terrestrial
Reference System (ITRS).
ITRS is currently under the responsibility of the IERS which establishes its primary
realization by producing a specific TRF designated as International Terrestrial Reference
Frame (ITRF).
Concerning vertical frameworks, the primary concept is the Vertical Reference System
(VRS).
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Lexicon
Geocentric Terrestrial Reference System (GTRS)
Geocentric Terrestrial Reference System is defined jointly by IAU and IUGG as “a system of
geocentric space-time coordinates within the framework of General Relativity, co-rotating
with the Earth and related to Geocentric Celestial Reference System by a spatial rotation
which takes into account the Earth orientation Parameters.”
International Terrestrial Reference Frame (ITRF)
Primary realization of the ITRS developed and published by the IERS. ITRF is therefore the
primary TRF related to the ITRS.
International Terrestrial Reference System (ITRS)
ITRS is the spatial tridimensional part of the specific GTRS for which the orientation is
operationally maintained in continuity with past international agreements (so-called BIH
orientation). Since 1988, this task has been assigned by the international scientific astrogeodetic community to the International Earth Rotation and Reference Systems Service
(IERS).
Terrestrial Reference Frame (TRF)
Realization of a TRS through the numerical realization of its origin, orientation and scale, and
their time evolution. This is currently obtained through a set of identifiers of physical points
(geodetic markers, tracking instrument reference points, center of mass of artificial
satellites…) with corresponding numerical coordinate information (values, derivatives,
tabulation…) expressed in a selected coordinate system linked to a specific TRS
Terrestrial Reference System (TRS)
Spatial reference frame co-moving with the Earth in space. The physico-mathematical model
of a TRS is the spatial part of a system of Earth-linked space-time coordinates within the
framework of General Relativity or an affine Euclidian reference frame in the framework of
Newtonian Physics.
Vertical Reference System
A specific height system, associated with a specific equipotential surface of the Earth’s
gravity field (geoid).
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
Inter-Commission Working Group 1.4: Site Survey and Co-locations
Chair: Gary Johnston (Australia), Pierguido Sarti (Italy)
Background
The IAG Sub-Commission 1.4 Site Survey and Co-locations operates jointly with the
IERS, Working Group on Site Survey and Co-location. The major goals and objectives of the
WG are to:
Develop site survey and standards, including:
•
Develop, test, compare and set standards on site survey methods, including
observational techniques, network design, classical adjustment, geometrical modelling
and/ or direct measurement techniques for invariant point determination, reference
frame alignment, software implementation and SINEX generation. This will include
the development of a standards document for undertaking site surveys;
•
Undertake test campaigns to be used for the comparison of different approaches to
local tie surveys addressing each of the technical elements;
•
Develop standards for the documentation of site surveys, including survey report
content and format; and
•
Suggest a pool of expertise to provide advice to survey teams, as required, on
standards for site surveys.
Assist in global local-tie coordination, including:
•
Liaise with local and international survey teams undertaking site surveys at important
co-location sites;
•
Liaise with the technique combination groups to ensure WG site survey products meet
user requirements;
•
Coordinate as required and make recommendations to observatories as to survey
scheduling and re-survey frequency;
•
Develop and distribute software tools to the community to assist in the generation of
site survey products, including SINEX generation software; and
•
Provide a forum to raise the profile of site survey as a critically important independent
geodetic technique.
Undertake site survey research, including:
•
Investigate new site survey methodologies, including observational techniques,
observational modelling, invariant point definition, geometrical modelling and/or
direct measurement techniques for invariant point determination, reference frame
alignment and structural deformation analysis.
Consider future planning issues, including:
•
The WG makes recommendations for the future in respect to the ongoing site survey
needs of the community and how these needs will be met in the long term (to address
issues outside of the scope of this WG).
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
•
Develop recommendations as to how the community can provide the IERS database
with all information relevant to inter-technique combination and to the maintenance of
the ITRF.
Meetings and Activity
A meeting was held in 2007, at EGU in Vienna, jointly with the GGOS Networks and
communication working group. Copies of presentations from that meeting can be found at
http://www.iers.org/MainDisp.csl?pid=68-40.
A meeting was held in 2008, at the AGU2008 meeting in San Francisco, US, jointly with the
GGOS Networks and communication working group. The meeting was well attended and
presentations from a number of speakers illustrated current topics of interest. A particular
emphasis was placed on attempting to establish a new methodology for monitoring
collocation vectors in near real time. The current survey methodology is episodic and as such
will not pick up variations to the collocation vector between surveys. The need to continually
refine accuracies was also discussed. With the GGOS aim of refining the accuracy of the
ITRF below the 1mm level it becomes imperative that component accuracies are well below
that level of accuracy. Current local tie accuracies are at the 1 – 5mm level and as such need
to be refined further. As usual the meeting also stressed the need to continue to develop the
concept of Local Ties as a key component of the technique combinations and reference frame
definition and to ensure all collocated sites have up to date tie information.
Change of Working Group Chair
The chair of the Working Group on Site Survey and Co-locations was changed at the end of
April 2009 from Gary Johnston (Geoscience Australia) to Pierguido Sarti (IRA-INAF, Italy).
The new charter of the working group was prepared in April 2009. It was endorsed by the
IERS Directing Board on the 19th April 2009 in Vienna and is reported below:
Introduction
Tie vectors are nowadays fundamental for the computation of global terrestrial reference
frames: the combination of the individual techniques-specific reference frames relies on the
accuracy of tie vectors as well as the number and distribution of co-location sites. In order to
be useful, tie vectors must be provided with full variance covariance information and must be
accurate to the 1 mm level. Variance covariance computation strictly attains to the data
processing phase of the tie vector; it can be rather simply achieved and should be regarded as
a mandatory task of any local tie. An accurate estimation of the tie vector is more difficult to
obtain and many efforts must be taken during the whole local tie process. The accuracy of a
tie vector is usually (and indirectly) assessed through a comparison with the space geodetic
solutions in the combination phase: the residuals of the combination are analyzed and used to
identify discrepancies between space geodetic and terrestrial measurements. If, on one hand,
these discrepancies simply highlight a disagreement for a specific co-location site, on the
other hand, they are the starting point for a rigorous investigation on the wide variety of
causes that might originate from technique specific problems. It should be noticed that the
whole process is characterized by the unavoidable complication of reliably coupling
measurements of different nature (space geodetic and terrestrial) related to different reference
points (electrical and conventional points, respectively).
Local tie surveys are usually performed combining terrestrial measurements of angles,
distances and height differences and aim at computing differential coordinates (local ties)
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
between space geodetic instruments expressed in a topocentric frame. In order to do so,
terrestrial measurements are performed and combined according to a geometric model (whose
complexity and flexibility can vary considerably) apt at realizing the conventional definition
of the instrument’s reference point. Regardless of the way the observations are acquired,
processed and conditioned (all these aspects obviously impact the tie vector estimation) it
should be noticed that it is impossible to directly observe the instrument’s electrical reference
point with terrestrial techniques (i.e. the antenna’s phase centre for GPS, VLBI and DORIS
and the photo-detector for SLR). Furthermore, the tie vector is naturally expressed with
respect to a topocentric frame and, in order to be useful, it must be accurately transformed
into a global frame.
Space geodetic observations are acquired at the electrical reference point and are commonly
referred to the conventional reference point by means of specific corrections and models that
are assumed to properly realize the connection. Many factors may influence the stability of
the electrical point and any inconsistency related to this very delicate connection phase
obviously reflects on the combination’s residuals. Addressing, investigating and
understanding electrical point instabilities has been a major concern for the whole geodetic
community and it is a mandatory task when tie vectors and space geodetic measurements are
combined.
The WG on site surveys and co-locations aims at enhancing the cooperation between the
groups involved in local tie surveys and their adjustment, the combination centres, the users
of tie vectors and the space geodetic techniques services (i.e. IGS, ILRS, IVS and IDS), with
the purpose of bringing together all necessary capabilities apt to improve present day
situation.
Cooperation with GGOS activities and its branches should be sought and established.
Goals and Objectives
The WG should spread the knowledge related to local surveys and their adjustment among the
national agencies in charge of co-location sites maintenance.
1. Site surveys standards:
a. Revise the local tie surveying activity developed so far. Identify open issues and
promote research and discussion.
b. Set guidelines related to in field operations.
c. Spread the know how among the community and the national agencies in charge of
co-located sites maintenance.
2. Tie vector estimation:
a. Set guidelines on tie vectors computational standards and their transformation into
global frame.
b. Provide local tie vectors with full variance-covariance information in SINEX
format.
c. Develop a concrete action plan to improve local ties for future ITRF realizations.
3. Site surveys activities:
a. Promote local tie surveying wherever needed.
b. Remotely assist site surveying activities.
c. Provide computational support.
Report of the International Association of Geodesy 2007-2009 ─ Travaux de l’Association Internationale de Géodésie 2007-2009
4. Coordination and research:
a. Liaise with technique combination centres.
b. Liaise with technique services.
c. Promote a joint effort aimed at focussing on the most recent combination residuals
of the global frame for investigating local inconsistencies at co-location sites and
identify actions to be taken to improve the performances of tie vectors within ITRF
like combinations.
The list of WG members and the schedule is currently being finalized and will be ready soon.
Other Activities
Geoscience Australia continues to undertake monitoring surveys at the Australian sites. A
new calibration pier at Mt Stromlo has been constructed in an attempt to refine the accuracy
of the Minico near real time IVP monitoring system. The IVP was showing an apparent
seasonal motion through the Minico system. It is believed that the tallest of the four
calibration piers was actually moving seasonally and this was biasing the IVP results at the
0.5mm level.
Plans are also being developed for local tie infrastructure at the Yarragadee site which will
have a 12m VLBI telescope installed in 2009. A methodology for surveying the relationship
between the VLBI dish, Moblas 5 system, Proposed NGSLR system and the variety of GNSS
sites is being developed.
IGN is now undertaking routine local tie surveys at numerous sites and offers this service to
observatory operators who are unable to complete their own surveys.
Pierguido Sarti from the Italian Istituto di Radioastronomia (IRA) reports that in 2007 they
have completely re-surveyed Medicina VLBI-GPS eccentricity and Noto elevation axis using
terrestrial observations.